![background image](http://html1.mh-extra.com/html/b-k-lighting/union-bollard/union-bollard_installation-instructions_3123442004.webp)
40429 Brickyard Drive • Madera, CA 93636 • USA
559.438.5800 • FAX 559.438.5900
www.bklighting.com • [email protected]
B-K LIGHTING
RELEASED DATE
06/27/2021
REFERENCE NUMBER
INS-2846-00
3. Secure receptacle cover by tightening #6-32
set screw using a 7/64” allen wrench.
IMPORTANT SAFETY INFORMATION LISTED ON REVERSE
READ, FOLLOW, AND SAVE ALL SAFETY AND INSTALLATION
INSTRUCTIONS
Union Bollard
Installation Instructions
DATA
Receptacle
RJ45
WIRING DIAGRAM
5. Place connection(s) and/or cable inside
receptacle.
4. Place connections into bollard. Attach
inner bracket with RJ45 jack with two (2)
#6-32 screws with a 7/64” allen wrench.
INSTALLATION OF RECEPTACLE (RE3 Option)
2. Loosen two (2) #6-32 screws with a 7/64”
allen wrench to remove inner bracket with
RJ45 jack.
3. Connect incoming data cable (by others)
to RJ45 jack as per installation plan. Follow
manufacturer’s instructions as per cable and
method of connection to RJ45 jack (cable and
connections required by others).
See wiring
diagram.
1. Open receptacle cover. Receptacle cover has
#6-32 screw for use with a 7/64” allen wrench.
2. Attach receptacle to installed anchor base
with (4) #10-32 stainless steel countersunk
screws at the base using a 1/8” allen wrench.
1. Attach ground from branch circuit to screw on
anchor base. Place connectors inside receptacle.
INSTALLATION OF RECEPTACLE (RE1 & RE2 Option)