background image

40429 Brickyard Drive • Madera, CA 93636 • USA

559.438.5800 • FAX 559.438.5900 

www.bklighting.com • [email protected]

B-K LIGHTING

RELEASED DATE

06/27/2021

REFERENCE NUMBER

INS-2846-00

3.  Secure receptacle cover by tightening #6-32 

set screw using a 7/64” allen wrench.

IMPORTANT SAFETY INFORMATION LISTED ON REVERSE

READ, FOLLOW, AND SAVE ALL SAFETY AND INSTALLATION 

INSTRUCTIONS

Union Bollard

Installation Instructions

DATA

Receptacle

RJ45

WIRING DIAGRAM

5.  Place connection(s) and/or cable inside 

receptacle.

 

4.  Place connections into bollard. Attach 

inner bracket with RJ45 jack with two (2) 

#6-32 screws with a 7/64” allen wrench.

INSTALLATION OF RECEPTACLE (RE3 Option)

2.  Loosen two (2) #6-32 screws with a 7/64” 

allen wrench to remove inner bracket with 

RJ45 jack.

3.  Connect incoming data cable (by others) 

to RJ45 jack as per installation plan. Follow 

manufacturer’s instructions as per cable and 

method of connection to RJ45 jack (cable and 

connections required by others). 

See wiring 

diagram.

1.  Open receptacle cover. Receptacle cover has 

#6-32 screw for use with a 7/64” allen wrench. 

2.  Attach receptacle to installed anchor base 

with (4) #10-32 stainless steel countersunk 

screws at the base using a 1/8” allen wrench.

1.  Attach ground from branch circuit to screw on 

anchor base. Place connectors inside receptacle. 

INSTALLATION OF RECEPTACLE (RE1 & RE2 Option)

Reviews: