Union Bollard
2. Connect conduit to the 3/4” primary
conduit couplers attached to the bottom
of the PVC housing. Place PVC housing in
hole.
3. Prep for concrete. Base is flush with finished
grade.
4. Pull branch circuit wiring necessary for
appropriate installation (by others).
1. Excavate trench according to designed lighting
plan. Dig hole a minimum of 24” deep and 10” wide
to accommodate PVC housing at desired fixture
location and direction of receptacle(s).
INSTALLATION OF PVC MOUNTING
Finished grade
Pea Gravel
or Sand
Concrete
Finished Grade
GRADE
GRADE
Finished grade
Pea Gravel
or Sand
Concrete
Finished Grade
GRADE
GRADE
Finished grade
Pea Gravel
or Sand
Concrete
Finished Grade
GRADE
GRADE
Installation Instructions
PVC HOUSING MUST BE INSTALLED AS PER GRADE LABEL. HOUSING IS LABELED AT GRADE LEVEL.
HOUSING INSTALLED BELOW GRADE WILL VOID WARRANTY
Align holes
for screw
orientation
3. Prepare epoxy (supplied) according to
instructions on packaging.
INSTALLATION OF BASE
6. Place base onto epoxyed PVC housing over
steel plate, lining up with steel plate mounting
holes and drilled mounting holes in concrete.
4. Use mixing stick to apply the epoxy to the
exterior of exposed PVC housing as shown, in
smooth, continuous application.
1. Steel plate and base has four (4) 5/16” dia. holes at
3” square on center for mounting hardware. Use
steel plate as template for final mounting drill hole
positions.
2. Drill four (4) holes into concrete for minimum
1/4” sleeve or wedge anchors for concrete.
Clean or vacuum debris from drilled holes.
Minimum of 1/4” dia. anchors must be used.
5. Place steel plate onto epoxyed PVC
housing, lining up with drilled mounting
holes in concrete.
IMPORTANT SAFETY INFORMATION LISTED ON REVERSE
READ, FOLLOW, AND SAVE ALL SAFETY AND INSTALLATION
INSTRUCTIONS