background image

RELEASED 

6-30-19

REFERENCE

 

NUMBER

INS-2804-00

40429 Brickyard Drive • Madera, CA 93636 • USA

559.438.5800 • FAX 559.438.5900 

www.bklighting.com • [email protected]

B-K LIGHTING

IMPORTANT SAFETY INFORMATION LISTED ON REVERSE

READ, FOLLOW, AND SAVE ALL SAFETY AND INSTALLATION INSTRUCTIONS

THIS DOCUMENT CONTAINS PROPRIETARY INFORMATION OF B-K LIGHTING, INC. AND ITS RECEIPT OR POSSESSION DOES NOT CONVEY ANY RIGHTS TO REPRODUCE, DISCLOSE ITS CONTENTS, OR TO MANUFACTURE, USE OR SELL ANYTHING 

IT MAY DESCRIBE.  REPRODUCTION, DISCLOSURE OR USE WITHOUT SPECIFIC WRITTEN AUTHORIZATION OF B-K LIGHTING, INC. IS STRICTLY FORBIDDEN.

Fixture Installation

1. 

 

 Place tree ring fixture around tree. 

Move fixture to desired height. Tighten 

the entire assembly to the tree with 

provided stand-offs.  

 

 

2.  Secure by hooking end of strap over two (2) 

Phillips screws. Secure by tightening two (2) 

Phillips screws with Phillips screwdriver.

PALM TREE RING MICRO NITE

Standard Installation 

5.    Bring line voltage cable from power line to main 

splice box location. Loosencord grip on bottom 

of splice box, feed linevoltage cable from power 

line through, then tighten cord grip to secure.

4.   Remove top of transformer housing by 

removing (4) #8-32 set screws using 5/64” Allen 

wrench. 

  Transformer housing will be marked for 

primary.

WIRING DIAGRAM

6.  Make watertight connections from primary 

branch circuit to transformer with waterproof 

wire connectors. (By Others). Fixtures are pre-

wired at factory on the secondary side.  

See 

wiring diagram.

LINE

Fixture

COM

GROUND

Transformer

GROUND IN HOUSING

Factory 

Wired

7.  Replace top of transformer housing with (4) 

#8-32 screws with 5/64” Allen wrench.

3.    Connect secondary cable then twist to secure 

in place.

Reviews: