![background image](http://html1.mh-extra.com/html/b-k-lighting/denali/denali_standard-installation_4436350002.webp)
4. Align holes to final installation orientation. Arrows
on temporary cover point towards screw location
on faceplate for alignment purposes.
NOTE: Do not remove temporary cover until
installation of faceplate.
2. Loop minimum of 6” of wiring inside housing to
allow for fixture service.
NOTE:
Do not remove temporary cover!
3. Place housing into hole. Surface mount collar
should rest on finished surface grade.
NOTE:
Do not remove temporary cover!
IMPORTANT SAFETY INFORMATION LISTED ON REVERSE
READ, FOLLOW, AND SAVE ALL SAFETY AND INSTALLATION INSTRUCTIONS
RELEASE DATE
06/26/2023
40429 Brickyard Drive • Madera, CA 93636 • USA
559.438.5800 • FAX 559.438.5900
www.bklighting.com • [email protected]
B-K LIGHTING
REFERENCE NUMBER
INS-2826-00
Standard Installation
DENALI
UPLIGHT - INTEGRAL
5” O.D.
5-1/2” O.D.
1. Drill 5” diameter hole into mounting surface at
uplight installation location as per lighting plan.
Do not exceed surface diameter, installation relies
on surface mount collar resting on surface grade.
Collar diameter is 5”. Surface mount flange is 5-1/2”
diameter
Pull primary 120v, branch circuit wiring.
Screws on faceplate will
align with alignment
arrows on temporary
cover
5. Use a silicone based sealant (not included) between
fixture and mounting surface.