In-Ground Installation Instructions
Soil Prep

RELEASE DATE

07/11/2023

40429 Brickyard Drive • Madera, CA 93636 • USA

559.438.5800 • FAX 559.438.5900 

www.bklighting.com • [email protected]

B-K LIGHTING

REFERENCE NUMBER

INS-2862-00

Conduit

trench

B.  Dig hole 10” wide and 10” deep.

Conduit

Trench

Excavated 

for Housing

C.  Prep soil according to DIG-IT Guide.

A.  Determine Soil Type by referencing DIG-IT Guide. 

Prep soil according to DIG-IT Guide.

Fixture Installation

5.  Place Power Pipe in hole.  

 NOTE: Leave sufficient wire length in the power 

pipe for future service.

6.  Orient the arrows on the  temporary cover to 

the desired position of the final faceplate screw 

placement.

 

NOTE: Do note remove temporary cover until 

installation of faceplate.

7.  Per DIG-IT Guide, backfill the gap between the 

bottom of housing and bottom of hole with sand or 

pea gravel for drainage.

 

NOTE: The mounting collar must be flush 

to finished grade. Use stability flange to aid in 

installation as shown.

Stability Flange

Rebar or Stake (Not Included)

Pea Gravel

Finished Grade

Pavers

Paver Sand

Soil

Screws on faceplate will 

align with alignment 

arrows on temporary 

cover

1.  Excavate trench according to designed lighting 

plan 12” deep and 12” wide suitable for the fixture 

housing. 

2.  Supply low voltage wiring necessary for installation.

3.  Slide stability flange onto housing.

 

NOTE: Product is supplied with a stability flange 

to anchor fixture and aid i

n installation.

4.  Loop minimum of 6” of low voltage wire inside 

housing to allow for fixture service. Place fixture in 

hole.

 NOTE: 

 

Do not remove temporary cover! 

Finished Grade

12”

Finished Grade

8 3/4”

LINE

12V

FIXTURE

COM

Remote

Transformer

COM

Screws on faceplate 

will align with 

alignment arrows on 

temporary cover

Stability Flange

Rebar or Stake (Not Included)

Pea Gravel or Sand

Finished Grade

Concrete

Stability Flange

Rebar or Stake (Not Included)

Pea Gravel or Sand

Finished Grade

Concrete

Finished Grade

Concrete

Wire Nuts Must 

Clear Opening

6” 

min.

Finished Grade

12”

Standard Installation