  Storage 

6.  If  the  battery  is  stored for  more  than  3  months, it  should  be  stored  under  environmentally 

controlled conditions: 

a.  Ambient temperature: 25 ±3°C 

b.  Humidity: 25-85% RH 

c.  Air pressure: 86kPa-106kPa 

7.  Do not store the battery in direct sunlight. 

8.  The battery should be charged and discharged every 6 months. 

9.  Battery storage SOC should be >50% 

  Safety 

  Before use 

1.  Inspect the battery to ensure that it is not damaged. If damaged, please inform the supplier. 

2.  Ensure that the installation is done by a qualified installer. 

3.  The installation needs to be done in compliance with the specified regulatory standards as 

required by governmental and local authorities. 

4.  Keep in mind that the battery terminals are live. 

5.  Ensure that the inverter is not powered from AC mains while connecting the battery. 

6.  It is advised to use suitable protection between the battery and the inverter. 

7.  Make sure  the  polarity  (positive  and  negative)  connections  between the batteries  (parallel 

use) and between the master/main battery and the inverter is correct. 

8.  Verify that the inverter parameters match that of the battery. 

9.  The battery should be kept away from heat, fire and water. 

10. Double check all connections before switching the breaker/isolator switch to the ON position. 

 

  During use 

1.  In the event of altering or moving the installation, make sure that the breaker switch is in the 

OFF position and the inverter is switched OFF. 

2.  Do not use this battery with that of another supplier or a different type of battery. 

3.  Do not use the batteries with a faulty or incompatible inverter. 

4.  Do not exceed the charging current and discharging current parameters of the battery. 

5.  Overcharging or over-discharging will shorten the life-span of the battery and may cause the 

battery pack fail or overheat and catch fire. 

 

Summary of Contents for AZBAT24100A

Page 1: ...ons in this document before operating the battery Table of Contents REVISION HISTORY 2 DISCLAIMER 2 OVERVIEW 2 PRODUCT INFORMATION 4 PRODUCTION DIMENSIONS 4 PARAMETERS 5 BATTERY INTERFACE 6 INSTALLATION 7 HARDWARE REQUIRED 7 INSTALLATION LOCATION 7 INSTALLATION PROCEDURE 8 PARALLEL CONNECTION 8 SERIES CONNECTION 9 TROUBLESHOOTING 9 BATTERY PACK VOLTAGE IS LOW OR ZERO 10 INSUFFICIENT ENERGY CAPACIT...

Page 2: ...Overview The AZBAT24100A incorporates 8 3 2V 8S1P configuration 100Ah Lithium Iron Phosphate LiFePO4 cells with a recommended 0 3C charge and 0 5C discharge current rating The battery incorporates a battery management system BMS which provides the following functionality Protection o Cell overcharge and discharge o Short circuit o Over and under temperature o Total over and under voltage Control o...

Page 3: ...0 C to 45 C 2 Do not open the battery disassemble or attempt to repair it as this will void the warranty 3 Do not remove or tamper with the QC sticker or any other labels on the battery as this will void the warranty 4 Do not connect the battery terminals directly to PV wiring 5 Do not connect multiple batteries in series 6 Do not use different battery make models manufacturers or products in para...

Page 4: ...zoteq Pty Ltd 2022 AZBAT24100A User Manual Page 4 of 13 All Rights Reserved Revision 1 02 September 2022 Azoteq PowerSense Series Product Information Production dimensions Figure 1 AZBAT24100A physical dimensions ...

Page 5: ...0 C less than 6 months 0 C to 25 C 12 months 25 85 relative humidity CHARGE AND DISCHARGE Charge Voltage 28 0V Float Sustain Voltage 27 2V Standard Charge 30A 0 3C Maximum Charge 50A 0 5C Standard discharge 50A 0 5C Maximum Discharge 95A 0 95C Battery Management System BMS Communication interface None Parallel 4 Max Series 2 Max External Battery balancer required Protection short circuit Short cir...

Page 6: ...ic after 1 minute or once charger is connected Protection temperature Charging over temperature 55 C Recovery of overcharge temperature 50 C Charging under temperature 0 C Re charge under temperature recovery 5 C Discharge over temperature 65 C Discharge over temperature recovery 55 C Balance Voltage 3 4V and 30mV while charging CERTIFICATION IEC 62619 UN38 3 Battery interface This section details...

Page 7: ...and installation requirements must be in regulation with the specified installation requirements as governed by the relevant authority in the country of installation Please ensure that a qualified installer familiar with the installation requirements is used for the installation The installation details must be sent to Azoteq for the warranty to apply along with an electrical Certificate of Compli...

Page 8: ... terminal 3 Connect the cables to the inverter via the DC fuse and breaker a Please ensure the polarity of the connection between the inverter and the batteries are correct 4 Once the above has been done please verify all the connections to ensure everything is as specified 5 Follow the instructions as specified in the installer manual before switching the inverter ON a The inverter should automat...

Page 9: ...BMS used in Li ion batteries b If a single battery reaches full charge it will prevent the other battery that it is connected to in series from continuing to charge c If a single battery reaches full discharge it will prevent the other battery that it is connected to in series from discharging further Troubleshooting Battery start up procedure In some cases the battery will go into a safe mode in ...

Page 10: ...hile the battery is connected to the inverter Battery pack voltage is low or zero 1 If the battery is fully charged it will open circuit to prevent overcharging a Applying a load will reset the protection feature 2 If the battery has been in storage for a long period or over discharged it will open circuit to prevent further discharging a Follow the battery start up procedure in Section 7 1 to re ...

Page 11: ...re that the inverter is not powered from AC mains while connecting the battery 6 It is advised to use suitable protection between the battery and the inverter 7 Make sure the polarity positive and negative connections between the batteries parallel use and between the master main battery and the inverter is correct 8 Verify that the inverter parameters match that of the battery 9 The battery shoul...

Page 12: ...material safety datasheet MSDS for the batteries on the Azoteq website Leaking cells 1 In the event of a cell leaking liquid or gas take caution to prevent any contact with the skin and eyes and inhaling the gas a Inhalation Evacuate the contaminated area immediately and seek medical attention b Contact skin Wash the affected area thoroughly with soap and water and seek medical attention c Contact...

Page 13: ...for any purpose Azoteq disclaims all warranties and conditions with regard to these products and information including but not limited to all implied warranties and conditions of merchantability fitness for a particular purpose title and non infringement of any third party intellectual property rights Azoteq assumes no liability for any damages or injury arising from any use of the information or ...

Reviews: