13
The machine is installed well as the following picture.
Attention: Before use the machine, please check all the screws and bolts are tightened.
4.2 Fasten the cyclone funel assemly on the
impeller housing by bolt M8X16.
4.3 Fasten the canister filter on the impeller
housing by bolt M8X16.
4.3 Fasten the dust collection drum on the
drum cover by two drum lock handles.