
AXIS PTZ Camera
Instructions
4. When the pressure inside the camera housing reaches 0.5 bar (7 psi) the pressure relief valve will open. Place your hand
over the pressure relief valve to verify that the gas is flowing out.
5. Lift the pressure relief valve to let the overpressure out of the camera unit.
6. Repeat the filling process a total of 3 times, leaving the camera pressurized the last time.
7. Put the caps back on the inlet valve and the pressure relief valve.
For more information, see the device’s installation guide.
10