Axioma QALCOSONIC E 1 Technical Description, Installation And User Instructions Download Page 5

PEE1V03        

 

    20-11- 2017 

2.  TECHNICAL DATA 

 

Accuracy class   

 

 

 

 

2  by LST EN1434-1:2007. 

Energy units 

 

 

 

 

              

kWh, MWh, GJ, Gcal 

Maximum value of thermal power 

 

 

 

5,28 MW 

 

Flow measurement 

The ratio of the permanent flow rate to the lower limit of the flow-rate

 

(the user selects during order): 

          q

p

/q

 100 , 

or   q

p

/q

 250 (only for flow sensors with q

 1,5 m

3

/h; 2,5 m

3

/h; 6,0 m

3

/h; 15 m

3

/h) 

 
Flow sensor can be delivered for threaded connection (up to q

p

 =10,0 m

3

/h) or flanged. 

 Technical data of the flow sensor are presented in table 1.1  

Table 1.1 

Permanent 

flow rate qp, 

m

3

/h 

Upper  

flow rate q

s

m

3

/h 

Lower  

flow rate qi, 

m

3

/h 

Threshold  

value of flow 

rate, m

3

/h 

Overall 

length L, 

mm 

Pressure 
losses at 

q

p

, kPa 

Joining to the pipeline  

 (Thread 

– G,  

flange

–DN) 

0,6 

1,2 

0,006 

0,003 

110 

G3/4“ 

0,6 

1,2 

0,006 

0,003 

190 

0,9 

G1“ arba DN20 

0,01 

0,005 

110 

11,3 

G3/4“ 

0,01 

0,005 

190 

2,5 

G1“ arba DN20 

1,5 

0,006 

0,003 

110 

17,1 

G3/4“ 

1,5 

0,006 

0,003 

190 

5,8 

G1“ arba DN20 

1,5 

0,015 

0,003 

110 

17,1 

G3/4“ 

1,5 

0,015 

0,003 

190 

5,8 

G1“ arba DN20 

1,5 

0,015 

0,005 

130 

7,2 

G1“  

2,5 

0,01 

0,005 

130 

19,8 

G1“ 

2,5 

0,01 

0,005 

190 

9,4 

G1“ arba DN20 

2,5 

0,025 

0,005 

130 

19,8 

G1“ 

2,5 

0,025 

0,005 

190 

9,4 

G1“ arba DN20 

3,5 

0,035 

0,017 

260 

G1 1/4“arba  DN25 

12 

0,024 

0,012 

260 

10 

G1 1/4“arba  DN25 

12 

0,06 

0,012 

260 

10 

G1 1/4“arba  DN25 

10 

20 

0,04 

0,02 

300 

18 

G2“ arba DN40 

10 

20 

0,100 

0,02 

300 

18 

G2“ arba DN40 

15 

30 

0,06 

0,03 

270 

12 

DN50 

15 

30 

0,15 

0,03 

270 

12 

DN50 

25 

50 

0,1 

0,05 

300 

20 

DN65 

25 

50 

0,25 

0,05 

300 

20 

DN65 

40 

80 

0,16 

0,08 

300 

18 

DN80 

40 

80 

0,4 

0,08 

300 

18 

DN80 

60 

120 

0,24 

0,12 

360 

18 

DN100 

60 

120 

0,6 

0,12 

360 

18 

DN100 

 

Temperature limits of heat conveying liquid: 

 

o

C....130 

o

C. 

 

Note:

  For heat conveying liquid temperature below 90 

o

C,  the calculator can remain on the flow sensor or 

be mounted on the wall.  
For heat conveying liquid temperature above 90 

o

C   

the  calculator  must  be  mounted  on  the 

wall. 

 

 

Connection cable length between the calculator  
and the flow sensor 

 

 

 

             1,2 m  
          (2,5 m or 5,0 m- according to the special order) 

            Maximum admissible working pressure                  

 16 bar or 25 bar. 

 

Behavior of the meter, when the flow rate exceeds the maximum value q

s

  

 

- At the flow rate q 

< 1,2 ∙ q

s  

-linear,  

 

 

- At the flow rate q 

> 1,2 ∙ q

s  

-  constant  (

q = 1,2 ∙ qs is applied to calculations of thermal energy). 

The error 

„Maximum allowable value of flow rate is exceeded“ is registered and duration of  error is calculated.   

          

 

Pulse inputs (additional) 

Number of pulse inputs   

 

 

 

Measurement 

unit’s 

 

 

 

 

m

Pulse value         

 

         

 

 

programmable 

Summary of Contents for QALCOSONIC E 1

Page 1: ...Axioma LEZ UAB ULTRASONIC THERMAL ENERGY METER QALCOSONIC E 1 TECHNICAL DESCRIPTION INSTALLATION AND USER INSTRUCTIONS PEE1V03 KAUNAS...

Page 2: ...2014 35 EU 2014 53 EU Directive 2014 32 EU of the European Parliament and of the Council of 26 February 2014 on the harmonisation of the laws of the member states relating to the making available on t...

Page 3: ...semblies of heat meter is permissible only after ensuring of absence of heat conveying fluid in the pipeline 1 APPLICATION FIELD The ultrasonic thermal energy meter QALCOSONIC E 1 is designed for meas...

Page 4: ...de Type Code None 0 MODBUS RS485 5 M bus 1 LON 6 CL 2 MiniBus 7 868 MHz RF module 4 BACnet 8 Power supply Code 3 6 V Internal battery 1 24 V AC DC main power supply 2 The length of the flow sensor sig...

Page 5: ...8 G1 2 5 5 0 025 0 005 190 9 4 G1 arba DN20 3 5 7 0 035 0 017 260 4 G1 1 4 arba DN25 6 12 0 024 0 012 260 10 G1 1 4 arba DN25 6 12 0 06 0 012 260 10 G1 1 4 arba DN25 10 20 0 04 0 02 300 18 G2 arba DN...

Page 6: ...month values of the measured parameters are stored in memory of the meter All data from archive can be read only by means of the remote reading see p 6 5 In addition data logger records of monthly par...

Page 7: ...t hour Pulse outputs Pulse outputs 2 OB normal mode OD test mode Type open collector permissible current up to 20mA voltage up to 50V Pulse duration 125 ms in the normal operating mode 1 2 ms in the t...

Page 8: ...nsor in return pipe Q V1 2 hT1 hT2 There Q thermal energy V1 Water volume m 3 1 2 Water densities according to supplied and return water temperatures 1 2 hT1 hT2 The enthalpies according to water temp...

Page 9: ...cumentation of other system components and in heat meter installation project It is forbidden to wire signal cables nearby less than 5 cm with power cables or cables of other devices It is forbidden t...

Page 10: ...d in several different ways Wall mounting without possibility sealing of mounting Wall mounting with possibility sealing of mounting Mounting on standard DIN rail Panel mounting Direct mounting on ult...

Page 11: ...th nominal diameter DN65 to DN100 necessary straight pipeline length in upstream direction are 5 x DN and in downstream direction 3 x DN For flow sensors of other sizes the straight pipelines installa...

Page 12: ...ng or leaving open the connector contacts you can choose the normal or verification test mode activate the pulse inputs or outputs Fig 6 1 Definition of jumpers 5 5 Verification of installation and se...

Page 13: ...ent units and operation modes Destination of the special symbols the flow is flowing forward right direction the flow is flowing backwards arrow is not displayed the flow does not flow Destination of...

Page 14: ...ing the readings in normal mode Integral parameters values 1 2 or if at least one error has been detected error code 1 1 are displayed if the button has not been pressed for more than 60 seconds INT i...

Page 15: ...tariff 1 INT INF BIL Snowflake indicates that the tariff is linked to the meter of cooling energy 1 5 Integrated energy of tariff 2 INT INF BIL Snowflake indicates that the tariff is linked to the met...

Page 16: ...p INT INF BIL INT INF BIL Changing with date stamp every 1 second 2 6 1 st pulse input pulse value on set day with date stamp INT INF BIL INT INF BIL Changing with date stamp every 1 second 2 7 2 nd p...

Page 17: ...INF BIL INT INF BIL Changing with date stamp every 1 second 2 14 2 nd pulse input pulse value on set day of previous month with date stamp INT INF BIL INT INF BIL Changing with date stamp every 1 sec...

Page 18: ...INT INF BIL INT INF BIL Changing with date stamp every 1 second 2 23 Minimum temperature difference of previous month with date stamp INT INF BIL INT INF BIL Changing with date stamp every 1 second 2...

Page 19: ...IL It is possible to choose One of the measured parameters 1 st or 2 nd pulse input if it is configured as an input one of the temperature or the temperature difference 3 12 Tariff 2 Similarly ID 3 11...

Page 20: ...on number 3 19 Serial number 3 20 MBus adress INT INF BIL 3 21 Working hours without a power calculation error INT INF BIL 3 22 Battery operation time INT INF BIL Remark Values of the parameters marke...

Page 21: ...d if the test mode is made active 4 3 Number of pulses of 1st pulse input INT INF BIL 4 4 Number of pulses of 2nd pulse input INT INF BIL 4 5 Temperature of heat conveying liquid in flow pipe INT INF...

Page 22: ...er than 1 2 qs are displayed q 1 2qs 8 electronics failure Active error codes are added and simultaneously displayed if it is detected more than one error 3 corresponds errors 2 1 5 corresponds errors...

Page 23: ...easurement units kWh MWh GJ Gcal Display resolution of energy 000000 01 Wh 0000000 1 kJ 0000000 1 kcal Display resolution of volume 00 000001 m 3 Energy and volume pulse values in verification mode TE...

Page 24: ...another type without removing of verification seal Data collection from meters can be realized via PC via telephone modem via GSM modem via Internet and so on 7 VERIFICATION Metrological control of h...

Page 25: ...PEE1V03 20 11 2017 25 Annex A Fig A1 Electrical wiring diagrams T1 flow temperature sensor T2 return temperature sensor V1 additional pulse input output 1 V2 additional pulse input output 2...

Page 26: ...t additionl pulse input output In Out1 Energy output for TEST mode Additional plug in modules Numbering of communication module terminals Terminal Nr Destination 20 CL CL module 21 CL CL module 24 25...

Page 27: ...of heat meter QALCOSONIC E 1 Fig B2 Sizes and dimensions of heat meter QALCOSONIC E 1 Fig B2 1 Flow sensor qp 0 6 1 0 1 5m 3 h Fig B2 2 Flow sensor qp 2 5 1 5 m 3 h Threaded end connections G3 4 Threa...

Page 28: ...3 20 11 2017 28 Annex B a Threaded end connection b Flanged end connection Fig B2 3 Flow sensor qp 0 6 1 0 1 5 2 5 m 3 h Threaded end connection G1 a flanged end connection DN20 b Mounting length L 19...

Page 29: ...PEE1V03 20 11 2017 29 Annex B b B2 4 pav Flow sensor qp 3 5 6 0 m 3 h Threaded end connections G1 1 4 a b flanged end connection DN25 b Mounting length L 260 mm a b...

Page 30: ...c Fig B2 5 Flow sensor qp 10 0 m 3 h Threaded end connections G2 a flanged end connection DN40 b c two design options Mounting length L 260 mm Fig B2 6 Flow sensor qp 15 0 m 3 h flanged end connection...

Page 31: ...qp 25 0 m 3 h flanged end connection DN65 Mounting length L 300 mm Fig B2 8 Flow sensor qp 40 0 m 3 h flanged end connection DN80 Mounting length L 300 mm Fig B2 9 Flow sensor qp 60 0 m 3 h flanged en...

Page 32: ...ng electronic module manufacturer security seal 3 mounting seal after installation a Flow sensor qp 0 6 1 0 1 5 2 5 m 3 h b Flow sensor qp 3 5 6 0 m 3 h threaded or flanged end connection threaded or...

Page 33: ...n and sealing WARRANTY Manufacturer gives the warranty that equipment parameters will meet the technical requirements listed in the paragraph 2 of this document if transportation storage and operation...

Reviews: