Operation instructions | SKF 40-00 | 8PSK/QPSK | FM Quattro module
12
2016-06-30 | © AXING AG Switzerland | Technical changes, design modifications, errors and misprints are subject to change
3.2.
Front page
The relevant information required for the function of the system are shown on the front page. The
bit error
rate
and the level of the tuners 1 to 4 are shown.
The
bit error rate
shows the amount of bit errors for the last 1,000,000 transferred bits.
3.2.1.
Initialization
The initialization is subdivided in 3 phases.
Phase 1: Tuners
Phase 2: Selection of programmes
Phase 3: Modulators
Here you can
navigate to the
Initialization
and
Maintenance
pages.
All manuals and user guides at all-guides.com