Installation in the headend base unit RFT-808:
The power supply unit RFP-808 integrated in the headend base unit RFB-808 has a short and a long DC
connecting cable on the output side.
Connect the short DC connecting cable to the first module
Connect the long DC connecting cable to the fourth module.
The other modules are connected to each other using the enclosed DC connecting cable SKZ 40-00.
Two separate DC connecting cables SKZ 40-01 are additionally required to supply the output combiner. The
connecting cables SKZ 40-01 are included in the scope of delivery.
Connect the output combiner with one SKZ 40-01 to the last module on the right and with the other SKZ 40-
01 to the third module on the left side.
Installation in the base unit RFB-804:
The power supply unit RFP-806 is not included in the scope of delivery of the base unit.
Mount the power supply unit according to the enclosed operating instructions of the power supply unit.
The power supply unit has a short and a long DC connecting cable on the output side.
Connect the short DC connecting cable to the first module.
Connect the long DC connecting cable to the third module.
The other modules are connected to each other using the enclosed DC connecting cable SKZ 40-00.
A separate DC connecting cable SKZ 40-01 is additionally required to supply the output combiner. The
connecting cable SKZ 40-01 is included in the scope of delivery.
Connect the output combiner to the last module.
2016-10-31 | Technical changes, design modifications, errors and misprints are subject to change without prior notice.11