![Avtec ecoarch Operator'S Manual Download Page 18](http://html1.mh-extra.com/html/avtec/ecoarch/ecoarch_operators-manual_3034346018.webp)
18
OM-ECOARCH
Installation Instructions
INSULATED STAINLESS
STEEL WALL PANELS
Pieces Provided: Insulated wall panel comes in multiple pieces.
1. Install wall panels prior to hanging hood(s).
2. Install first panel at one end. Top of panel should be installed 6’-6” A.F.F. and level.
Screw panel to wall.
3. Install any additional panels
4. Caulk vertical seam with NSF approved silicone sealant.
5. When hood is hung it will rest on top panel.
NOTE: Be careful to not damage wall panel face when installing hood.
1. Install wall panels prior to hanging hood(s).
2. Install seam strips at proper locations and screw to wall.
3. Apply glue to wall between seam strips.
4. Slip one end of wall panel into seam strip, pull out middle of panel and slip other end
of panel into other seam strip. Gently apply pressure over entire wall panel to secure to
wall. Wall bands for side walls are provide with 1” return bend, which is to be located
behind rear wall panels.
INSULATED WALL PANEL
SINGLE THICKNESS WALL PANEL
Summary of Contents for ecoarch
Page 7: ...OM ECOARCH 7 Installation Instructions Figure 5...
Page 8: ...8 OM ECOARCH Installation Instructions Figure 5 Continued...
Page 10: ...10 OM ECOARCH Installation Instructions Figure 6a RELAY BOX BALLAST BOX...
Page 11: ...OM ECOARCH 11 Installation Instructions Figure 6b...
Page 12: ...12 OM ECOARCH Installation Instructions Figure 6c...
Page 15: ...OM ECOARCH 15 Installation Instructions Figure 7 FOR CONTROL PANEL IF PROVIDED...