18
7.3 Testing Procedure
Note:
Avlite recommends that all testing be done during the day.
1.
Power the system on.
2. Check that no circuit breakers have tripped.
3. 4. Check function of all lights (i.e. MI and all LI single fixture lights) by carrying out the
following:
a. -
Night mode:
Cover the External Photocell and check night operation is
functioning as expected. The MI should either flash red (for Type B) or operate
as a red, steady burning light (for Type C). All of the LI single fixtures should be
illuminated red as steady-burning lights.
b. -
Day mode:
Uncover the External Photocell and check day operation is
functioning as expected. All lights should be off.
4. Turn the Photocell Bypass Switch to Override and ensure that all lights illuminate in
night mode.
5. Turn the Photocell Bypass Switch back to Auto.
6. For 01 & 02 Variants only:
Trip the breaker for the MI and ensure that the corresponding alarm is
received (if monitoring is installed)
Trip the breaker for the LI lights and ensure that the corresponding alarm is
received (if monitoring is installed)
DC Installation:
Connect the positive DC conductor to circuit breaker 1.
Connect the negative conductor to the common terminal block adjacent to the circuit
breaker on terminal block 1.