AV-09-4WL Solar Windsock Light Kit
Wiring of Completed Windsock Light Assembly
Tools required
• Spanner
• Philips head screwdriver
Unpacking Instructions
Unpack all hardware and verify container contents in accordance with Figure 10 “Windsock Light
Wiring”. Please contact your Avlite Systems office if there is any hardware missing.
Initial Inspection
Inspect all hardware for damage. If there is any damage, please contact your Avlite Systems Office.
Retain original packing material for possible future use in shipping the AV-09-4WL.
Wiring of Windsock Light
Refer to Figure 10 “Windsock Light Wiring” during installation of windsock light wiring.
The AV09 junction box base (Ref 10.2) has four empty cable glands along its sides which are used for
the AV09 power leads (Ref 10.1). The single cable exiting at the back of the junction box base is the
main power supply lead which is to be routed to the battery box.
a. Route the main power supply lead (coming from the back of the junction box base) down through
the top of the main windsock post, out through the bottom and over to the battery box cage (Figure
6). It is preferable to run the cable through some type of rubber grommet or boot at the top of the
post (client supplied) and it may be necessary to drill an exit hole near the base of the post (also
with a grommet).
b. Feed an AV09 power lead (Ref 10.1) through one of the empty cable glands in the junction box
and join the blue bullet connector to any unused blue connector in the box. Join the red bullet
connector to any unused red connector. Repeat for the remaining three AV09 power leads.
c. Fit the junction box lid (Ref 10.3) to the junction box base using screws (Ref 10.4).
d. Attach the completed junction box to the windsock light mounting bracket using bolts (Ref 10.5),
washers (Ref 10.6) and self locking nuts (Ref 10.7).
Important: Ensure that the junction box lid is faced down.
e. Secure all loose cables using nylon cable ties. Client supplied.
f.
Pass the lead through the remaining unused cable gland in the back of the battery case.
g. Connect the main power supply cable ends to the load terminals on the solar regulator.
h. Close battery case lid and engage latches. Close battery box cage door and fasten shut with nut &
bolt or padlock as required (client supplied).