Install the ACM Embedded Controller and V100

Subpanels

Shown below is an overview of the positioning of the ACM Embedded Controller and V100 subpanels.

FPO75

B100 D8P

C4

ACM

Embedded 

Controller

V100

V100

Install the ACM Embedded Controller and V100 subpanels as shown below:

1. Unbox the Avigilon ACM Embedded Controller and V100 subpanels.

2. Locate 12 screws from the accessory bag in the FlexPower box.

3. Verify battery jumper (Batt) on the ACM Embedded Controller has been set to ON position.

$"65*0/ ‰

This is a non-PoE device. Do not connect J1 (Ethernet port) to a PoE-capable port. This

applies to both direct PoE Power Sourcing Equipment (Endspan PSE) and PoE injector (Midspan PoE)

equipment. Not all PSE's correctly detect non-PoE capable devices, and such PSE's may not fucntion as

expected when connected to non-PoE equipment.

4. Set Port 1 terminating jumper (P6 Port 1 TERM Resistor) to IN position.

5. Verify Port 2, 3, 4 terminating jumpers are in the OUT position.

Install the ACM Embedded Controller and V100 Subpanels

13

Summary of Contents for AC-HID-LSP-ACMEC-KIT4

Page 1: ...Installation Guide Avigilon 4 Door ACM Embedded Controller Kit AC HID LSP ACMEC KIT4 ...

Page 2: ...copyright industrial design trademark patent or other intellectual property rights of Avigilon Corporation or its licensors This document has been compiled and published covering the latest product descriptions and specifications The contents of this document and the specifications of the products discussed herein are subject to change without notice Neither Avigilon Corporation nor any of its aff...

Page 3: ...is equipment has been tested and found to comply with the limits for a Class A digital device pursuant to part 15 of the FCC Rules These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment This equipment generates uses and can radiate radio frequency energy and if not installed and used in accordance with the ...

Page 4: ...up the B100 Power Supply Board 11 Setup the D8P Power Supply Board 11 Setup the C4 Power Supply Board 12 OTUBMM UIF NCFEEFE POUSPMMFS BOE 7 4VCQBOFMT Configure and Wire Data 14 Configure and Wire Power 17 1PXFS 0O DDFTTJOH NCFEEFE POUSPMMFS QQMJDBUJPO GPS UIF JSTU 5JNF By Virtual Port 20 By Host Name 20 IFDLMJTUT Tools Checklist 21 Equipment Checklist 21 4 ...

Page 5: ...ser interface which links to the ACM Embedded Controller application The application allows you to effectively control access at each entry point Package Contents The package contents for the 4 Door ACM Embedded Controller are l One AC LSP 4DR HID LCK LifeSafety Power four door HID dual voltage integrated power system shipped in a separate box l One Avigilon AC HID ACMEC V1000 ACM Embedded Control...

Page 6: ...of this document and gather the required information before proceeding with these instructions 65 0 The controllers and interface panels are sensitive to Electrostatic Discharges ESD Observe precautions while handling the circuit board assembly by using proper grounding straps and handling precautions at all times 6 Installation ...

Page 7: ...weighs 11 8kg 26lb 3 Mount the plywood board onto the wall at the desired location 05 It is highly recommended that the plywood board is mounted to two studs If no studs are available use appropriate drywall anchors that can support the enclosure 4 Remove one of the two high voltage knockouts 5 Attach an appropriate cable gland to the 7 8 diameter high voltage opening 6 Mount the enclosure to plyw...

Page 8: ...e three AC wires through 2 3 1 6K Wb M bM _ZR VWUV e ZcMUR Xd PcW O g fVWZR M Q MaR bM _ZR PMOZR UZM Qb 65 0 Do not connect to the main power supply yet 8 Remove knockout s for low voltage input output wires as necessary 9 Attach an appropriate cable gland to each 1 3 8 diameter low voltage opening 8 Mounting the ControlPanelCase ...

Page 9: ...75 Power Supply Board Follow the steps below to setup the FPO75 power supply board 1 Either l For 120V input leave JP1 intact l For 230V input cut JP1 65 0 Failure to cut this jumper when using the FPO with a 230VAC input will result in damage to the system and will void the warranty Power Supply Board Overview 9 ...

Page 10: ...s on the FAI Fire Alarm Input to the building s fire alarm system as required See the FPO Quick Start Manual page 3 FAI Input Usage for more detail Further information is available at http lifesafetypower com docs im_fpo pdf 4 Either l If a backup battery is used move the jumper to position 1 as shown below l If no backup battery is used move the jumper to position 2 10 Setup the FPO75 Power Suppl...

Page 11: ...il available at http www lifesafetypower com docs im_b100 pdf Setup the D8P Power Supply Board On the D8P board set the JP1 to 4 output voltage selection jumpers to provide 12VDC See the D8 Quick Start Manual or D8 D8P Installation Manual for more detail available at http www lifesafetypower com docs im_d8 pdf 65 0 Failure to set the JP1 to 4 jumpers may cause damage to components Setup the B100 P...

Page 12: ...ut Selection Either 1 Relay Contact Output 2 Voltage Output Yellow 1D to 4D Voltage Bus Selection Either 1 B1 Bus 2 B2 Bus Black 1E to 4E Dry Output Selection Either 1 Relay Contact Output 2 Voltage Output White 1F to 4F Output Invert Either 1 NO voltage when input is activated 2 NC voltage when input is deactivated See the C4 C8 Quick Start Manual or C4 C4P C8 C8P Installation Manual for more det...

Page 13: ...erify battery jumper Batt on the ACM Embedded Controller has been set to ON position 65 0 This is a non PoE device Do not connect J1 Ethernet port to a PoE capable port This applies to both direct PoE Power Sourcing Equipment Endspan PSE and PoE injector Midspan PoE equipment Not all PSE s correctly detect non PoE capable devices and such PSE s may not fucntion as expected when connected to non Po...

Page 14: ...e top V100 to Address 0 as shown in step 4 l Set the bottom V100 to Address 1 as shown in step 4 05 Always use stranded wires the recommended gauges are l 18 AWG low voltage power wires l 22 AWG data wires Configure and Wire Data Follow the steps below to configure and wire the ACM Embedded Controller 1 Connect the white enclosure tamper wires to Tamper on the ACM Embedded Controller Polarity does...

Page 15: ...l block l Wire C to Batt Fail 22 AWG l Wire NO to Batt Fail 22 AWG ACM Embedded Controller Tamper Input 5 AC Fail Input 6 Batt Fail Input 7 12 24VDC IN FPO75 SYS FLT AC FLT FAI INPUT C NC NO C NC NO 4 On the FPO75 s ACFLT terminal block l Wire C to AC Fail 22 AWG l Wire NO to AC Fail 22 AWG ACM Embedded Controller Tamper Input 5 AC Fail Input 6 Batt Fail Input 7 12 24VDC IN FPO75 SYS FLT AC FLT FA...

Page 16: ...A B and Shield inputs to the V100 Subpanels as shown below 22 AWG A B Shield ACM Embedded Controller V100 Addr 0 A B Shield P9 RS 485 In V100 Addr 1 A B Shield P9 RS 485 In P3 RS 485 Port 1 05 On the V100s make sure to use the RS 485 In avoid using the RS 485 Out 16 Configure and Wire Data ...

Page 17: ...1 V100 12VDC to Out3 and to Out3 V100 Addr 0 Tamper Input 5 AC Fail Input 6 Batt Fail Input 7 12VDC IN V100 Addr 1 Tamper Input 5 AC Fail Input 6 Batt Fail Input 7 12VDC IN D8 OUT 8 7 6 5 4 3 2 1 05 For steps below ensure that the card reader door monitor if available request to exit if available and lock wiring from the door are fed into the power supply enclosure and route to the corresponding p...

Page 18: ...ed configuration IN1A IN4B O1A O4B IN1A IN1B IN4A IN4B IN3A IN3B IN2A IN2B NO C NO C NO C NO C Using the default C4 configuration 7 4USJLF 3FMBZ DPOGJHVSBUJPO PDLFE 6OMPDLFE NO C recommended 0V 24V C NC alternate option 24V 0V If deviation from the default configuration is desired see the C4 C8 Quick Start Manual or C4 C4P C8 C8P Installation Manual for more detail available at http www lifesafety...

Page 19: ...uld be on and all warning lights see 2 above should be off 2 Connect the battery set s if applicable See the FPO Quick Start Manual page 1 Battery Terminal Connection for more detail Further information is available at http lifesafetypower com docs im_ fpo pdf 65 0 Observe battery polarity or damage to the system will occur 3 Connect the ACM Embedded Controller J1 Ethernet port to a laptop or desk...

Page 20: ... 254 x x address 5 Open a web browser and enter this address 169 254 242 121 The controller is now accessible through this virtual port 6 Enter your login for the application The default username and password is admin By Host Name To access the ACM Embedded Controller application by this method your DHCP server must support hostname access and only have one controller in the local area network LAN...

Page 21: ...cutter Required Wire stripper Required Laptop Recommended Multi meter Optional Equipment Checklist The following equipment is provided 5PPM 3FRVJSFE 3FDPNNFOEFE 0QUJPOBM One AC LSP 4DR HID LCK LifeSafety Power four door HID dual voltage integrated power system supplied in a separate shipping box Required One Avigilon AC HID ACMEC V1000 ACM Embedded Controller Required Two AC HID VERTX V100 reader ...

Page 22: ...opening Required One plus cable gland s for 1 3 8 low voltage opening Required 18 AWG stranded wiring Required 22 AWG stranded wiring Required Ethernet Cat5e cable Required One to two sets of 2x 12V backup batteries in series to deliver 24V power Optional Backup batteries provide the ability to power the system in case of power outage For more information refer to Section 3 Specifications of the D...