3. Place the power cord in the notch of the retainer.
Grounding the chassis
Ground the chassis before you install power supplies or connect power and network cables to the
system.
Before you begin
• Ensure you have a two-hole cable lug that fits over the grounding studs.
• Ensure you have a nut and a locking washer for the grounding stud.
Virtual Services Platform 9010 chassis
October 2015
Installing the Avaya VSP 9000
42