Contents - Page 27
System Handover
Checklist
Equipment:
– Have all extensions been tested?
– Have all exchange lines been tested?
– Have all private wires been tested?
– If fitted has the modem/Reporter been tested?
– Is system programming in line with the customer specification?
– Have system backup disks been made and left on site?
– Has the customer been made aware of the drop back (power fail) locations?
Are those clearly marked and have they been tested?
– Has the mains supply (and any UPS if fitted) been tested?
– Have any peripheral systems been tested (e.g. CCC, Voice Mail, etc)?
Wiring:
– Is the distribution wiring satisfactory to the required national standards?
– Are all wires and cables clearly labelled.
– Is the site clean and tidy with all rubbish removed?
Documentation:
– Have the system documents, TJF records and floor plans been completed?
Information:
– Have the handset user guides been issued to the user.
– Has the customer been made aware of the telephone number for
maintenance/fault reports.
Installation Manual INDeX Media Gateway
Contents - Page 27
38DHB0002UKGA Issue 1 (12/05/2004)