19
Finishing the Water Cooler Installation
Be sure to dispense a little water from both the hot and cold buttons prior to
flipping on the heating (#9) and cooling (#8) switches located on the back of the machine.
8. Once the heating switch (#9) is turned on (I),
it will take 15-20 minutes for the water to
reach it's desired hot temperature.
15-20
min
Hot
1 hr
Cold
9. Once the cooling switch (#8) is turned
on (I), it will take up to 1 hour to reach the
desired cold temperature.
Getting Started
Summary of Contents for A9
Page 1: ...A few simple steps to ensure perfect water every time ...
Page 2: ......
Page 6: ......
Page 15: ...Getting Started ...
Page 27: ...User Guide and Maintenance ...
Page 32: ...Cleaning ...
Page 39: ...Troubleshooting ...
Page 42: ...Safety ...
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......