background image

Overview

The IC7-C and IC9-C meter is 
230/400 volt 50 Hz, 5 amp current 
transformer operated meter 
designed for measuring 3 phases 
in a 4 wire star configured system 
and is capable of transmitting 
kWh and KVAh by means of 
the volt free outputs which are 
standard on the basic model. The 
model IC9-C is supplied with fully 
programmable RS485-Modbus 
communication output and is 
capable of transmitting all of the 
data the meter monitors.

Installation

Orientation

The meters are designed to be 
fitted into a panel, normally a 
switchgear cabinet. It is therefore  
recommended that the front of 

 
 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

the meter is positioned vertically 
with adequate space around and 
at the back for connections.

Location

The meters should be mounted in 
a dry dirt free environment away 
from all heat sources and very 
high electric fields. Temperatures 
should not exceed 70°C or fall 
below -20°C.

Installing the meter.

First remove the meter from the 
packaging and check for any 
damage. The meter should be in 
two pieces, a Front Bezel and the

back of the meter. (See diagram 
1 above) The aperture required to 
fit the meter is 92 mm x 92 mm.

Holding the back of the meter 
in one hand and the bezel in 
the other hand, present to the 
opening. Slide the back of the 
meter first through the opening 
on the rear side of the door and 
then push the bezel from the 
front side over the protruding 
clear plastic and push fully  
home until it locks firmly.  
Please note it is extremely 
difficult to remove when fitted. 
Please see diagram 1. 

Check Contents

Package should contain:

1.  Black locking bezel

2.  Main meter case

3.  Top terminal cover

4.  Lower terminal cover

The Information Centre 

ic

7

-C and 

ic

9

-C

Diagram 1. 

Meter Installation

Diagram 2. 

External Dimension 

92

16

16

124

12

75

64

12

95

150

92

43

15

Communication

Sockets

Cable Channel

Cable Channel

Cable Entry

All Dimensions in mm

DILL SWITCH

Phasing and polarity of the AC 
current and voltage inputs and 
their relationship is critical to the 
correct operation of this meter.

The connection diagram shows a 
current transformer fitted to the 
Neutral.

If you do not want to monitor the 
neutral current it is not necessary 
to connect to terminals 7 and 8. 

Terminal 9 is the Neutral supply 

Terminals 10,11,and 12 are the 
three phase line voltages (230 
volt). Terminals 14,15, and 16 are 
the low voltage pulse output. (volt 
free)

2

L3

N

LOAD

MAINS

L3

L2

L2

L1

L2

S2

S1

P2

P1

S2

S1

P2

P1

S2

S1

P2

P1

S2

S1

P2

P1

L1

1 Amp

230/400Volt 50Hz
0.1-5Amp

Communication

Sockets

Cable Channel

Cable Channel

Fu

se

Cable Entry

DILL SWITCH

ON

DIP

1

2

3

4

5

6

7

8

1

2

3

4

5

6

7

8

ON

DIP

1

2

3

4

5

6

7

8

1

2

3

4

5

6

7

8

Summary of Contents for IC7-C

Page 1: ...installation and operation manual IC7 C and IC9 C horizon r a n g e The fusion of land based metering and ether based monitoring 9...

Page 2: ...ing Slide the back of the meter first through the opening on the rear side of the door and then push the bezel from the front side over the protruding clear plastic and push fully home until it locks...

Page 3: ...t programming details for your chosen CT ratios e When the process is complete press the Function key to take you back to the default screen Note When setting CT ratios and if you have only three digi...

Page 4: ...IMPORT ENERGY KWH 000000 00 KVAH 000000 00 KVARH 000000 00 EXPORT ENERGY KWH 000000 00 KVARH 000000 00 VOLTAGE L 1 000 0 L 1 L2 000 0 L2 000 0 L2 L3 000 0 L3 000 0 L3 L1 000 0 FREQUENCY 50 00Hz AMPS L...

Page 5: ...will take you to the desired screen To return to the normal screen press FUNCTION key again If you enter an incorrect number or a function which is not available on this model you will see the screen...

Page 6: ...50 To check connections enter function 50 See Page 5 function operation display Press Funct key to see connections Press Funct key to return to normal display PULSE TEST Function 60 To test the relay...

Page 7: ...ches needs to be in the on position To allocate meter register number 14 dill switches numbers 5 6 and 7 must be in the on position To allocate meter register number 39 dill switches numbers 3 6 7 and...

Page 8: ...se Duration 80 100 ms closure Pulse Value C T Value less than 1000 5A 1 kWh imp C T Value 1000 5A or more than 10 kWh imp 0 4 0 3 0 2 0 1 0 1 0 2 0 3 0 4 0 1 1 0 2 0 3 0 4 0 5 0 6 0 IC9 Load Curve 0 5...

Page 9: ...n depth stock holding combine to provide a level of service which has earned the appreciation of customers across the spectrum of the UK and export markets Computerised distribution systems are geared...

Reviews: