background image

2

Tech Support 770-844-4200

www.productivity2000.com

Power Supply Installation Procedure

Step One: 

Locate the left most 

socket in the base.

Step Two: 

Insert the Power 

Supply at a 45° angle 

into the notch located 

at the bottom of the 

base and rotate up 

until seated in socket.

Locked

Step Three: 

Snap the retaining tab 

into the locked position.

AC(L)

AC(N)

GND

LOGIC

GND

P2-01AC

Power Hookup

Grounding

A good common ground reference (earth ground) is essential for 

proper operation of the Productivity2000 system. One side of all 

control circuits, power circuits and the ground lead must be properly 

connected to earth ground by either installing a ground rod in close 

proximity to the enclosure or by connecting to the incoming power 

system ground. There must be a single-point ground (i.e. copper bus 

bar) for all devices in the enclosure that require an earth ground.

Reviews: