SL 90X-91X
Technical Manual
NAM-SL 90X-91X-TM-02-EN-E
With a constant view to adopting the latest technological developments, Automatic Systems reserves the right to amend the above information at any time
.
p. 18/37
8.
Checklist: Required Tools
The following equipment is required for the site preparation work:
Implementation drawings
•
These drawings are essential for the installation of the Security Entrance Lane
•
They are provided with the contract agreement and are specific to each installation
Crowbar
Dolly
Fish tape
Hammer
Level
Sharp knife
Tape measure
Terminal block screwdriver
Vernier caliper
Wire stripper
Wrench set