Insert components
1
Click Schematic tab
➤
Insert Components panel
➤
➤
Insert
Hydraulic Components.
2
In the Insert Component: Hydraulic Symbol dialog box, click Meters.
3
In the Hydraulic: Meters dialog box, click Pressure Gauge.
4
Respond to the prompts as follows:
Specify insertion point:
Select to place the pressure gauge to the far left (and slightly above) of the pump
5
In the Insert/Edit Component dialog box, specify:
Component Tag:
MTR1
Description: Line 1:
Pressure Gauge
Click OK.
6
Click Schematic tab
➤
Insert Components panel
➤
➤
Insert
Hydraulic Components.
7
In the Insert Component: Hydraulic Symbol dialog box, click General
Valves.
8
In the Hydraulic: General Valves dialog box, click Shut Off Valve Open.
9
Respond to the prompts as follows:
Specify insertion point:
200 | Chapter 10 Pneumatic, Hydraulic, and P&ID Diagrams
Summary of Contents for 225A1-05A111-1001 - AutoCAD Electrical 2009
Page 1: ...AutoCAD Electrical 2010 Getting Started January 2009 Part No 225B1 050000 PM01A ...
Page 6: ...Index 245 vi Contents ...
Page 8: ...2 ...
Page 12: ...6 ...
Page 22: ...16 ...
Page 24: ...18 ...
Page 128: ...122 ...
Page 142: ...136 ...
Page 170: ...164 ...
Page 172: ...166 ...
Page 194: ...188 ...
Page 222: ...216 ...
Page 224: ...218 ...
Page 234: ...228 ...
Page 250: ...244 ...