Autarco S2.GPRS-BOX Installation Manual Download Page 7

 

Installation manual 

 

 

 

IM.S2.GPRS-GATEWAY.EN-V1.0 

                

 7 

 

 

 

2.2

 

Connection with multiple inverters 

 

1.

 

Parallel connect multiple inverters with network cables. 

2.

 

Connect first inverter to gateway with monitoring cable. 

3.

 

Set different address for each inverter. For example, when connecting three inverters, the address of 

first inverter must be set as "01", the second must be set as "02", and the third must be set as "03" and 

so on. 

a.

 

On the inverter, press ENTER and then UP/DOWN to navigate to SETTINGS 

b.

 

Select SET ADDRESS 

c.

 

Set address and press ENTER to save 

d.

 

For further details, please refer to inverter manual 

4.

 

Connect gateway to power supply with power adapter. 

 

 

 

 

 

 

 

 

 

 

2.3

 

Confirm connection 

 

When all connections are finished and with the power on for about 1 minute, check the 4 LEDs. If POWER and 

STATUS are permanently on, and LINK and 485/422 are permanently on or flashing, connections are successful. 

If any problems occur, please refer to Chapter 5 ‘Debug’. 

 

 

 

Summary of Contents for S2.GPRS-BOX

Page 1: ...Autarco Group B V IM S2 GPRS GATEWAY EN V1 0 Installation manual GPRS Monitoring Gateway for Autarco inverters...

Page 2: ...se read the manual carefully before installation operation or maintenance Keep this manual for future reference Product information is subject to change without notice All trademarks are recognized as...

Page 3: ...nitoring Gateway 6 2 1 Connection with single inverter 6 2 2 Connection with multiple inverters 7 2 3 Confirm connection 7 3 Setting up the SIM card 8 3 1 Unlock the security code on your SIM card 8 3...

Page 4: ...tructions WARNING Indicates safety instruction which if not correctly followed can result in injury or property damages The GPRS Monitoring Gateway can collect information of PV systems by GPRS commun...

Page 5: ...wise It should at all times be installed indoors WARNING When you screw unscrew or adjust the antenna please make sure that you only use the metal part of the antenna Do not hold the plastic part whil...

Page 6: ...t inverter to gateway with monitoring cable and connect gateway to power supply with power adapter WARNING Power supply of inverters must be cut off before connection Make sure that all connections ar...

Page 7: ...and the third must be set as 03 and so on a On the inverter press ENTER and then UP DOWN to navigate to SETTINGS b Select SET ADDRESS c Set address and press ENTER to save d For further details pleas...

Page 8: ...nputting the current PIN code OK iPhone WARNING Most iPhones use a SIM card in the so called nano size If you would like to use an iPhone for this procedure you will have to make sure the SIM card is...

Page 9: ...low maximum bandwidth Some providers have a portal to manage multiple cards Please contact your provider for installation outside the Netherlands 4 Registration 4 1 Check connection in MyAutarco In M...

Page 10: ...nection between gateway and inverter is abnormal LINK On Gateway connected to server connection is normal Flashing Data is transmitting between gateway and server Off Connection between gateway and se...

Page 11: ...lashing GSM signal is too weak Move gateway or adjust the antenna to other position for better signal Antenna is loose Check if the antenna is loose if so please screw to tighten On X X O GSM signal i...

Reviews: