background image

9

Id.Nr.: 234660-8 • GB

Execution: Operator, installing companies
Time interval every 6 months

Maintenance and Repairs:

If there should be no water or a permanent leakage on the safety valve when the water heater is heating 
up, then the valve should be released by activating the lifting device several times or by trying to flush-out 
any foreign bodies (e.g. lime-scale particles) that may be present on the sealing component.

If this should not be successful, then repairs should be made by calling in an installing company. In the 
event of damage to the seating of the valve or sealing ring, the complete safety valve must be exchanged.

Execution: Installation companies
Time interval annually

In order to check the return valve, the shut-off valve should be closed and no water should flow out from 
the opened check valve.

The operation of the storage tank is performed through the hot water valve of the fixture that is being used 
(mixer tap).  The storage tank is therefore permanently under line pressure.  In order to protect the internal 
boiler against excessive pressure during the heating-up process, the expansion water that results from this 
is channelled through the safety valve. In order to prevent excess pressure damage to the hot water heater, 
it is essential that lime-scale encrusted safety valves should be replaced. The return valve prevents the flow 
back of the hot water into the cold water line network in the event of any reduction in the line pressure and 
thereby protects the boiler against heating up without water.  The storage tank can be separated on the 
water side via the shut-off valve and thereby also in terms of pressure from the cold water line network and 
can be emptied if need be via the drain valve.

11. Electrical Connection 

11.1 General Instructions

The connection with the power grid must be implemented in conformity with the applicable national 
regulations and standards, the relevant connecting requirements of the local power company and water-
works, as well as the standards of the Mounting and Operating Instructions, and must be performed ex-
clusively by a licensed electrician. The stipulated protective measures must be executed carefully, so that 
no other power-supplied devices are affected thereby in the event of a malfunction or failure of the hot 
water tank’s power supply (e.g. freezer, rooms used for medical purposes, units for intensive care, etc.).
In rooms with bathtubs or showers, the device must be installed in accordance with the national laws and 
regulations (e.g. of ÖVE-SEV, VDE or DIN VDE 0100-701).
The technical connecting requirements (TAB) of the relevant energy supply company must absolutely be 
observed.
A residual current circuit breaker with a tripping current I

∆n

≤30mA must be connected in series before the 

electric circuit.
The device must only be connected with permanently laid lines.
These types of water heaters are to be supplied exclusively via a hard-wired connection cable and are 
therefore not suitable for connection via a shock-proof plug (SKI). Accidental activation of the upstream 
RCD is to be avoided in this way.
An all-pole disconnecting unit with at least 3mm contact clearance must be connected in series before 
the device. This requirement is fulfilled e.g. by an automatic cutout.
It is imperative that the hot water tank is filled with water prior to electrical start-up.
In accordance with the safety regulations, the hot water tank must be switched powerless, secured 
against being switched on again and checked for powerlessness prior to any intervention. Interventions 
to the electrics of the device must only be performed by a licensed electrician.
As a rule, the electrical connection must be performed in accordance with the circuit diagram affixed 
inside the connecting area of the tank!

Summary of Contents for VACUMAIL series

Page 1: ...Operating and assembly instructions Pressure proof electric water heater of the model series VACUMAIL 50 bis 150 Liter Please pass on to the end user Id Nr 234660 8 GB...

Page 2: ...rage tanks technical features which provide significant benefits for you Thanks to the environmentally friendly CFC free insulating foam an extraordinarily low standby energy consumption is guaranteed...

Page 3: ...ture setting 5 7 Operating prerequisites 6 8 Assembly and safety instructions 6 9 Dimensional drawing 7 10 Domestic hot water connection Pressure resistant 8 11 Electrical connection 9 11 1 General in...

Page 4: ...he following table gives some guidelines on consumption figures The temperature of the necessary cold water for mixing at the given hot water temperature has been assumed as being approximately 12 C 3...

Page 5: ...capabilities or those who lack experience and or knowledge unless they are being supervised by someone responsible for their safety or have received instructions on how the equipment is to be used Ch...

Page 6: ...o avoid the danger of fracturing Failure to observe this may result in the risk of injury due to the equipment falling down b A wall rail for suspending the upper fixing hook is included in the packag...

Page 7: ...t is fitted with a safety temperature limiting device which switches off any further heating of the equipment upon reaching a maximum water temperature of 110 C The selection of the connecting compone...

Page 8: ...n air so that neither frost nor being blocked up with dirt or something similar can be the cause of a breakdown Care should also be taken to ensure that the outlet pipe from the safety valve is instal...

Page 9: ...connection with the power grid must be implemented in conformity with the applicable national regulations and standards the relevant connecting requirements of the local power company and water works...

Page 10: ...lve of the safety valve combination whilst at the same time opening all hot water valves of the connected fittings that are used Draining is also possible via the safety valve in the expansion water f...

Page 11: ...scaling pump The equipment is finally to be fully rinsed out and the heating up procedure is to be observed as per the initial commissioning c To be entitled to make claims under the warranty that is...

Page 12: ...ge as a consequence of aggressive waters water not suitable for drinking in accordance with the national regulations e g Austrian ordinance on drinking water TWV Fed Law Gazette II No 304 2001 deviati...

Page 13: ...onditions it can be concluded that if all requirements are met norms installation and operation guide general guidelines etc the device or product fault resulting in the secondary damages would not ha...

Page 14: ......

Page 15: ......

Page 16: ...90 30 E Mail ahirmer austria email at Id Nr 234660 8 GB Austria Email AG Austriastra e 6 A 8720 Knittelfeld Telefon 03512 700 0 Fax 03512 700 239 Internet www austria email at E Mail office austria em...

Reviews: