![AUSTRALIAN MADE GREAT MATE Installation And Setup Instructions Download Page 7](http://html1.mh-extra.com/html/australian-made/great-mate/great-mate_installation-and-setup-instructions_3019533007.webp)
© 2012 G Force Automatic Gates All Rights Reserved
Pre-Installation Set Up and
Testing
Double Swing Gate
Battery Connection for Bench Testing
ALWAYS TURN THE POWER OFF AND DISCONNECT THE BATTERY BEFORE MAKING
ANY WIRING CONNECTIONS
2 Core 1.5mm
Twin Active
Cable
Battery
Wires
Slave Motor Power Wires and
Connection Terminal Block
Motor M2
Terminals
Motor M1
Terminals
Connect a 2 core wire (1.5mm Twin Active cable) from the slave motor connection terminal block
to the unused motor terminals on the circuit board.
Battery Connection
Double piggy back spade
connectors for solar power or
single spade connectors for
transformer power
Place the battery on the bench between the motors
Refer to the “DC 2
Circuit Board”
data sheet included with this manual and locate the battery
wires on the circuit board. Ensure the battery wires are correctly connected to the correct
terminals on the circuit board. Connect the other end of the battery wires to the battery terminals
on the battery. Note the polarity (
Red
wire to
Red
battery terminal,
Black / Blue
wire to
Black
battery terminal). The board should now be powered and great care should be taken to avoid
shorting out or otherwise damaging the circuit board.
WARNING: Care should be taken as there are moving components inside the
gate motor that may cause damage or personal injury.