16
Step 16
Main Burner Assembly
A.
Slide the burner tubes down through the indicated holes in the bowl and align the holes in the burner brackets with
the holes in the Bowl. Verify that the valve nozzles are inserted in the ends of the burner tubes. (See Detail)
B.
From underneath the Bowl, verify that the valve nozzles are inserted in the ends of the burner tubes. Fasten the
Main Burner to the Bowl with 2) #5 x .31” Tapping Screws.
A
B
#5 x .31” Tapping Screw
2 pcs.
Detail
Burner
Tube
Valve
Nozzle