AUO AC Unison
[AUO AC Unison Installation Guide]
[Page 20 of 44]
[February 2012 Rev. 1.0]
Step 4 Mounting the Data Logger
With the mounting pins pointing up, first secure
the mounting bracket to the wall with two screws
provided and, suitable anchors if needed. Then,
mount the Data Logger as shown securing the
Data Logger in place by inserting the provided
screws in the anchor holes as indicated. The Data
Logger is rated NEMA 3R and suitable for outdoor
use. Mount vertically and do not place in direct
sunlight.
*
Torque screws to 20 in-lbs
Step 5 Replace protective covers
First replace the blue AC terminal cover securing the screws. Then replace the front cover
and secure
the screws as shown in Step 4, torque screws to 20 in-lbs
Step 6 Data Logger Start-up
The Data Logger will automatically boot-up when it
detects utility power. The Data Logger will display the
“PLEASE WAIT” message during its initialization
process. Please allow about 20 minutes for the Data
Logger to fully start up.
Do not interrupt the AC
power supply during the boot-up sequence.
Once
the initialization process has completed, the LCD
displays the shown “
HOME SCREEN
”.
Step 7 AC Unison Module
Discovery
Navigate the Data Logger’s menu by pressing
for
the next menu and
to enter/select. Please enter
the “Setup” menu and select the “DISCOVER” function.
After this “Discovery” process, the LCD will display the
number of modules discovered and real-time power
generation.
[Module Count] [Today’s Power Generation] [Internet
Handshake]
Summary of Contents for AC UNISON
Page 7: ...AUO AC Unison AUO AC Unison Installation Guide Page 6 of 44 February 2012 Rev 1 0 ...
Page 10: ...AUO AC Unison AUO AC Unison Installation Guide Page 9 of 44 February 2012 Rev 1 0 ...
Page 11: ...AUO AC Unison AUO AC Unison Installation Guide Page 10 of 44 February 2012 Rev 1 0 ...
Page 12: ...AUO AC Unison AUO AC Unison Installation Guide Page 11 of 44 February 2012 Rev 1 0 ...
Page 39: ...AUO AC Unison AUO AC Unison Installation Guide Page 38 of 44 February 2012 Rev 1 0 ...