-
INSTALLATION
PRIMO PILOT
MANUAL
-
32
A2 - Hydraulic schematic diagrams
BP :
By-Pass
D :
Filling
valve
ECS :
Domestic Hot Water
P :
Purger
PD :
Decoupling
pump
R :
Heating
circuit
SB :
DHW tank sensor
SCh :
Safety valve
SP :
Hot water outlet sensor
VE :
Expansion
vessel
A2.1 - Hydraulic connection between the pilot
and the heat pump
A2.2 - Minimum fl ow rate to respect depending
on the heat pump model
Distances for connection to HTi
70
6, 8, 11 and 14 kW.
Minimum Ø of piping to respect
HTi
70
6kW
and HTi
70
8kW
HTi
70
11kW
HTi
70
14 kW
< 10m
22/24
24/26
28/30
> 10m and < 15m
24/26
28/30
32/34
> 15m and < 25m
28/30
32/34
36/38
> 25m and < 50m
32/34
36/38
42/44
Heat pump model
HTi
70
6kW
HTi
70
8kW
HTi
70
11kW
HTi70 14kW
Minimum nominal
fl ow rate
1000L/h
1350L/h
1550L/h
2000L/h
Maximum pressure
2,5 bar
2,5 bar
2,5 bar
2,5 bar