Top off cooling system -->
Cooling system, draining and filling
.
Check oil level -->
Oil level, checking
.
Tightening torques
*Replace bolts
*Coat thread and contact surface of bolt head with hot bolt paste G 052 112 A3
Charge air cooling components, removing and installing
NOTE:
After installing turbocharger, run engine for approx. 1 minute at idling
speed and do not rev up immediately. This ensures turbocharger is
properly lubricated.
Component
Nm
Coolant supply line to turbocharger
35
Coolant line bracket to turbocharger
10
Turbocharger to exhaust manifold
35 * See note
Component
Nm
Turbocharger bracket to cylinder block
25
Turbocharger bracket to turbocharger
30
Catalytic converter to turbocharger
30
Oil return line to turbocharger
10
Oil supply line to turbocharger
23
Oil supply line bracket to cylinder head
23
Heat shield to secondary air line
3.5
Hose clamps for coolant hoses
2
Hose clamps for air hoses
3.5
NOTE:
Secure all hose connections with standard hose clamps
Before performing checks or repair work, make sure that all lines and
hoses are securely connected and that there are no leaks.
2005 Audi A4 Quattro
ENGINE 1.8 Liter 4-Cyl. 5V Turbo Engine Mechanical, Engine Code(s): AMB
1:01:24 AM
Page 248
cardiagn.com