Protected by copyright. Copying for private or commercial purposes, in part or in whole, is not
permitted unless authorised by AUDI AG. AUDI AG does not guarantee or accept any liability
with respect to the correctness of information in this document. Copyright by AUDI AG.
– Position reducing agent container on engine and gearbox jack
- VAS 6931- with mounting plate - V.A.G 1383A/1- . The dif‐
ference in height of the reducing agent container and the filler
neck must be between 60 - 80 cm -dimension A-.
– Position filling device for AdBlue - VAS 6542- on filler neck
-arrow- in spare wheel well and screw it on as far as stop.
– Open cut-off valve for breather line.
– Open cut-off valve for filler line and fill passive tank completely.
Tank is completely full when container contracts and bleeder
line fills with liquid.
– Close cut-off valve for filler line.
– Close cut-off valve for breather line.
– Disconnect quick-release coupling on breather line and let any
excess liquid flow into a suitable container.
– Close quick-release coupling for breather line.
– Unscrew filling device for AdBlue - VAS 6542- from tank filler
neck.
– Clean filler neck and tank cap with a lint-free cotton cloth
soaked with water.
– Screw filler cap onto reducing agent tank.
Step 2 - filling active tank:
– Open tank flap and unscrew filler cap for reducing agent tank.
– Clean filler neck of tank for reducing agent with a lint-free cot‐
ton cloth soaked with water.
Audi A8 2010 ➤
Maintenance - Edition 11.2014
134
3. Maintenance