![ATT Hammer Jet v1 Operating Manual Download Page 39](http://html1.mh-extra.com/html/att/hammer-jet-v1/hammer-jet-v1_operating-manual_3005308039.webp)
39
If a new turbine module is installed, then ship the replaced turbine module to Applied Turbine Technologies
for service etc.
Pack the replaced turbine module into a suitable box with sufficient protection against damages during
transport. State your contact details on the supplied shipment label, place the label on the transport box
and return the parcel.
Overview of recommended maintenance and service
Daily
Remarks
Every 10 Hours
Yearly/50 Hours
Clean the entire chassis
Remove dust, dirt, bitumen or
other sticking materials
Check for loose bolts
etc. And tighten if
necessary
Clean the wheels
If cleaned with water, then dry
before installation
Clean the nozzle
Remove bitumen or other sticking
materials
Check the Air Filters
Replace if dirty or showing signs of
tear
Replace the Air Filters
Turbine Module
compartment
Remove any dust and dirt and fuel
in the turbine compartment with a
dry and clean cloth or
Turbine Module incl.
nozzle
Remove any dust and dirt, and
ensure free air opening on the
nozzle
Service check at
ATT
Wheel inspection and replacement
The Hammer Jet wheels are subject to extensive heat and wear. It is recommended that they are replaced,
as soon as they show signs of damage. New wheels and other spares and accessories can be ordered via
our distributors (see more on our website:
https://zirocco.dk/en/distributors
or if distributors are not
available via direct order to
Figure 50 – Hammer Jet wheels