ATT Hammer Jet v1 Operating Manual Download Page 27

27

Figure 31 - Power and communication connectors

3) Secure the fuel hose with a hose lock nut.

                                  

Figure 32 - Loose fuel 
connection

Figure 33 - Secured fuel 
connection

Summary of Contents for Hammer Jet v1

Page 1: ...Revision 1 April 2020 Operating Manual Hammer Jet v1 Dryer Cleaner...

Page 2: ...s 15 Operation 16 Safety Instructions 16 Before start up 17 Safety Stop 18 Power up and start up 19 Shut down and Cooling 22 Parking transport and storage 22 Dismantling the turbine module from the ch...

Page 3: ...s DIRECTIVE 2006 42 EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 17 May 2006 on machinery The EMC Directive 2004 108 EC Person authorized to collect technical data and make them available to th...

Page 4: ...204 2006 Safety of machinery Electrical equipment of machines General requirements DS EN ISO 13849 1 2006 Safety of machinery Safety related parts of control systems General principles for design ISO...

Page 5: ...the machine and 103 dBA at the operators position at its max performance The LWA is here not directly related to an environmental noise level as weighted average of the different work steps during ma...

Page 6: ...NRR protection rating 15 23 29 33 dBA reduction NRR 7 2 4 8 11 13 Requirement dB A 85 85 85 85 In this table the LWA value is used in the calculation of the TWA dose as a worst case although the opera...

Page 7: ...e or manufacturer Obligations of the Operator Before starting work all operators are obliged to as follows x To comply with the basic workplace safety instructions and accident prevention regulations...

Page 8: ...s The product is using the exhaust from a micro jet turbine to dry and clean the surfaces and should not be used on surfaces covered with sand or gravel as well as waste of or close to flammable mater...

Page 9: ...o ejection of debris such as dust sand or small gravel which can lead to eye injuries Examples of intended use x Drying and cleaning prior to road marking x Drying and cleaning prior to crack repair a...

Page 10: ...of the following reasons Non compliance with the instructions in this Operating Manual Use of the product for a purpose it is not designed for Natural wear or tear Incorrect installation performed by...

Page 11: ...es a requirement for operations many airports etc Drying and cleaning speed up to 2 5 km h depending on the surface and weather conditions and nozzle width Product Overview Hammer Jet in the dedicated...

Page 12: ...minutes on the installed turbine module 2 Next service time in hours and minutes for the installed turbine module Display Ready to Start This information appears app 5 seconds after activation of the...

Page 13: ...le air temperature 2 Battery voltage Must be higher than 11 2V before start up 3 Power output 4 Throttle set point Display Low Power Setting 1 Nozzle air temperature 2 Battery voltage Must be higher t...

Page 14: ...2V before start up 7 Power output 8 Throttle set point 1 Keep the nozzle opening 1 2 cm above the surface to get optimal drying speed Do not force the nozzle opening into the surface because this wil...

Page 15: ...0 Label Hearing protection Warning sign 9000 10 Turbine oil ATT Turbine oil 7000 80 200 mm Wheel for Hammer Jet 200 mm 5000 430 A50H v1 Hammer Jet Turbine Module HS 8411810090 Turbine incl Flange and...

Page 16: ...eep a distance of at least 5 m from the machine during operation Hearing and eye protection The personnel in the immediate vicinity of the Hammer Jet must use hearing protection and safety goggles whe...

Page 17: ...This will shelf the product against dents dust and dirt Always keep the Hammer Jet Transport Box clean and tidy Before start up Figure 8 Fuel mix and amount 1 Place the Hammer Jet in horizontal posit...

Page 18: ...harging and battery level of minimum 11 2V S Safety y Stop 1 Press the Stop button also used for reset during cooling down to turn off the Hammer Jet turbine will enable cooling down Figure 9 Power le...

Page 19: ...n the power button to turn the display on 1 Wait 5 10 seconds until the ECU has started and the display settles with the shown information 1 Push the stop reset button to reset the display and enable...

Page 20: ...dication Figure 16 Step 6 Option Low or High on the Power button 1 Choose between High or Low throttle on the Throttle Mode Switch for activation of the relevant air flow for the task the higher throt...

Page 21: ...ted in respectively Figure 4 and 5 3 During operation in Low or High power mode the level can be changed to either either Low or High directly by adjusting the Throttle Mode Switch see figure 15 or to...

Page 22: ...nly to use the Stop button to stop the turbine operation 1 The turbine can be restarted once the display indicates lower than 4 0K RPM by following the steps from figure 12 2 If the Hammer Jet has bee...

Page 23: ...len key H4 bit 4mm Allen bit Figure 23 Tools for dismantling the turbine module 1 Locate the 8 socket head bolts use the H4 to unscrew them by turning counter clockwise Figure 25 Unscrewing the socket...

Page 24: ...nter clockwise Remove the fuel hose by pulling it towards the handle while slightly moving it from side to side Figure 25 Fuel connection 3 Locate the power connector and the communication connector U...

Page 25: ...t of the machine Figure 27 Nozzle removal direction Installing the turbine module Tools Needed Ratchet 4mm Allen key H4 bit 4mm Allen bit Turbine module 8 pcs of 5x12mm socket head 4mm allen top Figur...

Page 26: ...ine module insertion 2 Secure the turbine with the 8 pcs of 5x12 mm socket head Make sure to tighten it in a cross directional pattern Figure 30 Screw tightening pattern 2 Reconnect communication and...

Page 27: ...27 Figure 31 Power and communication connectors 3 Secure the fuel hose with a hose lock nut Figure 32 Loose fuel connection Figure 33 Secured fuel connection...

Page 28: ...green light see also the charger manual delivered with the Hammer jet charger This is also needed after an extended storage period 3 4 weeks ONLY USE THE ATT SUPPLIED CHARGER 1 Unpack the charger and...

Page 29: ...36 Secured charging connection Filter Removal Tools required Ratchet 4mm Allen key H4 bit 4mm Allen bit Figure 37 Filter removal tools 1 Remove the 4 screws securing the filter cover 2 on each side us...

Page 30: ...lter illustration 3 Before taking the Hammer Jet into use again make sure to replace the filter When inserting the new filter make sure that it is correctly installed into the chassis Figure 40 Wrong...

Page 31: ...ne compartment Figure 41 Turbine compartment Figure 42 cleaning of the turbine compartment Use a heavy duty paper towel for cleaning to make sure that no debris or smaller pieces from the paper or clo...

Page 32: ...lling 1 Refuel when empty for preparation of the next utilisation of the Hammer Jet Premix turbine oil and fuel in a separate canister plastic canisters are recommended Refill by removing the Fuel Tan...

Page 33: ...can be inspected by lifting of the filter cover after releasing the 4 filter cover bolts 2 pcs on each side 4 The air filter must be replaced if contamination is hindering free air flow to the turbin...

Page 34: ...el specifications Exxsol D80 or Shellsol D70 petroleum Kerosene 3 ATT Turbine Oil Fuel capacity 3 8 L 1 Gallon Average fuel consumption 10 15 L h 3 4 US Gallons h Battery Li Po 11 1 V 4500 mAh Generat...

Page 35: ...35 Figure 46 Hammer Jet Dimensions Figure 47 Hammer Jet illustration...

Page 36: ...protection Caution the nozzle cover can still be warm after the turbine has cooled down Order immediately new warning signs if the old ones get damaged Warning signs can be ordered via ATT or Distrib...

Page 37: ...37 Troubleshooting Off conditions...

Page 38: ...letion of the service check of the turbine module box after maximum 50 hours or once a year ATT has the only authorised workshop for repair and service checks Filter cover Inspect the cover daily Clea...

Page 39: ...hen dry before installation Clean the nozzle Remove bitumen or other sticking materials Check the Air Filters Replace if dirty or showing signs of tear Replace the Air Filters Turbine Module compartme...

Page 40: ...and vibrations The Hammer Jet should be stored in the relevant packaging box from ATT Transport only in the original transport box from ATT Ensure charging minimum every 3 4 weeks to prevent battery d...

Page 41: ...Applied Turbine Technologies Telephone 45 70236080 E Mail info zirocco dk or support zirocco dk Website www zirocco dk...

Reviews: