![ATS GDS-12 Installation, Operation And Maintenance Manual Download Page 19](http://html1.mh-extra.com/html/ats/gds-12/gds-12_installation-operation-and-maintenance-manual_3005228019.webp)
GDS ©2016
19
Troubleshooting
TROUBLESHOOTING GUIDE
PROBLEM
CAUSE
CORRECTION
U.V. lamp will not light Check input voltage if below
Install a voltage regulator
or
above
120
volts
Electrical cord disconnected
Check, replace
or
outlet
defective
Defective
U.V.
lamp Replace
lamp
Defective
lamp
ballast Check
output
voltage
Replace
ballast
Loose
open-circuit
wire
Trace
out
and
repair
Leak at quartz nipple
Defective or cracked O-Ring
Replace O-Ring
O-Ring not seated properly
Replace O-Ring
Cracked
quartz
sleeve Replace
quartz
sleeve
GDS ©2019 • www.aquat.com
Summary of Contents for GDS-12
Page 2: ...GDS 2016 2 ...
Page 7: ...GDS 2016 7 Installation Diagram GDS 2019 www aquat com ...
Page 17: ...GDS 2016 17 Circuit Board Layout GDS 2019 www aquat com ...
Page 21: ...GDS 2016 21 Specifications GDS 2019 www aquat com ...
Page 22: ...GDS 2016 22 Notes GDS 2019 www aquat com ...