background image

GDS ©2016

12

Maintenance

acid container.  It is important to handle the quartz sleeve 

with care to prevent breakage.  Make certain that all finger 

prints are wiped clean before reinstalling (see installation of 

the  quartz  sleeve).    Replace  O-Ring  [ATS8-544(1)]  every 

time a quartz sleeve is cleaned or replaced. We recommend 

replacing the quartz sleeve once a year.

U.V. LAMPS:

INSTALLATION OF THE ULTRAVIOLET LAMPS:

**DO NOT PUT POWER ON AT THIS TIME!**
CAUTION: Never operate or look directly at U.V. lamp 

outside the disinfection chamber.

Make sure unit is unplugged when installing or servicing 

ultraviolet lamp.  Remove any paper tabs on the U.V. lamp 

and avoid allowing fingerprints and other debris to deposit.  

Carefully place the lamp inside the quartz sleeve leaving 

enough space to connect the socket connector to the lamp 

pins.  Then gently slide the brass dust cap over the end nut, 

securing the lamp and protecting it from dust.

ULTRAVIOLET LAMP MAINTENANCE 

REQUIREMENTS:
The U.V. lamp is rated for 9,000 hours of continuous use.  

After this period of time, the U.V. lamp has undergone a 

photochemical change.  While the lamp will not normally 

be burned out, the lamp quartz may no longer emit the 

254-nm shortwave U.V. to effectively kill bacteria.  Failure 

to replace the U.V. lamps every 9,000 hours may cause 

bacteriological breakthrough.  Should the use of the 

disinfection unit be intermittent, in no case should the 

U.V. lamp be used for more than 24 months regardless of 

the number of hours of operation due to normal shelf life 

degradation of the U.V. bulb.  Changing the quartz sleeve 

should be done at the same time U.V. lamp replacement is 

scheduled. 
It is recommended that your water supply be tested 

periodically (yearly) through your local health department or 

approved certified laboratory.

ELECTRICAL:
The GDS series are furnished with 6’ line cord that will plug 

into a 120V outlet.  Electrical receptacles must be properly 

grounded for safe operation.  Improper grounding will void 

any warranty.
When possible use a separate breaker to minimize voltage 

fluctuations  and  avoid  accidental  shut  off.    After  unit  is 

installed and water is turned on, plug the unit into 120V wall 

receptacle.  View lamp operation through safety Sight Port 

lens.  NOTE: Avoid exposing your eyes to U.V. light.

QUARTZ SLEEVE:
Installation of the Quartz Sleeve:
Always handle quartz sleeves carefully to prevent breaking 

or chipping.  The quartz sleeves are to be clean and free of 

fingerprints before installing.  
After unplugging the unit, remove the brass dust cap and 

electrical connection. Then remove brass end nut. Install 

the quartz sleeve through the stainless steel threaded nipple 

until it is centered in the quartz spring. Use a small amount 

of plumber’s grease and install the O-ring around the quartz 

sleeve. Avoid riding the  O-Ring on any threaded part of the 

nipple.  Hand-tighten the brass end-nut to form a compression 

seal around the quartz sleeve.  Avoid over tightening the nut, 

which may cause a fracture on the end of the quartz sleeve.  

Under  normal  operation  conditions,  hand-tightening  will 

provide a 100 psi seal.  Do not use any devices to tighten end 

nut.
After you have tightened the brass end nut and all other 

plumbing connections, open the outlet valve.  Slowly open 

the inlet valve and flush out all remaining air.  Then close 

the outlet valve and slowly open the inlet valve fully.  Check 

the unit for leaks.  If you find a leak at the brass end-nut, 

tighten the brass end-nut further.  If the leak continues, drain 

the unit and inspect the quartz O-Ring and quartz sleeve for 

proper seal.  Once you complete checking the unit, reassemble 

O-Ring and tighten brass end-nut.  Repressurize the unit and 

check again.

REQUIREMENTS FOR CLEANING THE QUARTZ 

SLEEVE:
As water passes through the U.V., minerals, debris and other 

matter in the water may deposit onto the quartz sleeve.  After 

sufficient film has formed on the quartz sleeve, the ability of 

the ultraviolet germicidal rays to pass though the quartz sleeve 

and into the water may be impaired.  Therefore, it is necessary 

to determine a cleaning schedule for the quartz sleeve.  The 

frequency will depend on the specific type of water conditions.  

If the water has been processed through deionization, reverse 

osmosis, or is distilled, cleaning may be required only once per 

year.  If untreated water is used, the cleaning frequency will 

vary.  A minimum of once yearly is standard recommendation 

for cleaning and lamp replacement.  Contact your local dealer 

for scheduling this service.  Your specific situation will vary the 

frequency time according to the water quality of the home or 

facility application. 
QUARTZ SLEEVE CLEANING PROCEDURES:
To  clean  the  quartz  sleeve,  turn  off  the  water  flow  to  the 

disinfection unit, turn power off, and at a separate faucet or 

valve relieve the water pressure from the UV. Then disconnect 

the electrical service to the lamp pins.  Carefully remove the 

U.V. lamp.  Loosen the end nut with O-Ring and remove the 

quartz sleeve.  The quartz sleeve may then be washed with a 

mild soap and hot water solution and rinsed clean with hot 

water.  Should this be insufficient to clean the quartz sleeve, 

a mild acid may be used (i.e. vinegar).  Be certain to follow 

all recommended safety and handling procedures on the 

GDS ©2019 • www.aquat.com

Summary of Contents for GDS-12

Page 1: ... Info Installation Operation and Maintenance Manual CAUTION Read and Follow all safety rules and operating instructions before first use of product Ultraviolet Disinfection Systems Models GDS 8 GDS 12 GDS 20 ...

Page 2: ...GDS 2016 2 ...

Page 3: ...6 Installation Diagram 7 Electronic Controls Startup Procedures 8 Sanitation Procedures 10 Maintenance 12 Unit Parts Breakdown 13 Circuit Board Layout 16 Wiring Diagram 17 Troubleshooting 18 Sterile Water Sample Precedures 19 Specifications 20 Notes 21 Warranty 23 Table of Contents GDS 2019 www aquat com ...

Page 4: ...ause an unsafe condition 7 Intended for indoor use Do not install this disinfection system where it will be exposed to the weather Do not store this disinfection system where it will be exposed to temperatures below freezing unless all the water has been drained from it and the water supply has been disconnected 8 Read and observe all the important notices and warnings on the water disinfection sy...

Page 5: ...tion equipment may be required if these parameters cannot be maintained Flow rate must not The GDS series has an unique design with an ultraviolet germicidal lamp housed within a single quartz sleeve surrounded by a stainless steel pressure chamber The chamber is fabricated out of 304 Stainless Steel These units come with an ultraviolet lamp designed with four pins at one end The quartz sleeve is ...

Page 6: ...proper wall support Use anchores with screws for sufficient support not included A lock nut secures the mounting bracket to the U V chamber If your piping system is subject to impulse pressure resulting in a water hammer condition a surge tank or other means must be provided to remove this condition otherwise this extreme shock pressure condition may rupture or fracture the quartz sleeve Make all ...

Page 7: ...GDS 2016 7 Installation Diagram GDS 2019 www aquat com ...

Page 8: ... This is also equipped with an internal and external fused surge protection system This solid state electronic circuit board provides the latest in U V lamp monitoring technology U V LAMP CONTROL START UP PROCEDURE 1 Make sure the U V lamp is inserted per instructions into the quartz sleeve and U V chamber Then plug the U V lamp into the end lamp connectors 2 Plug the unit into a 120V wall plug ou...

Page 9: ...GDS 2016 9 Sample Screen Shots GDS 2019 www aquat com MONTH DAY ALARM Fig 1 MONTH DAY ALARM Fig 2 MONTH DAY ALARM Fig 3 MONTH DAY ALARM Fig 4 ...

Page 10: ...er in the well and storage tank should be treated with a strong chlorine solution to destroy disease organisms All pipelines and fixtures in the distribution system should be rinsed and flushed with chlorinated water Upon installation of a U V disinfection unit or yearly bulb replacement service disinfection with chlorine to initially flush the system is recommended to assure line sanitation prior...

Page 11: ... disinfect the water if necessary Plumbing Line Sanitation Only When installing an ultraviolet disinfection system a pre filter with sump may serve as a source to sanitize the water lines only For whole system disinfection follow procedure as outlined above Source The Pennsylvania State University College of Agriculture Cooperative Extension How to Sanitize a Water System Using Well Sanitizer Pell...

Page 12: ...trical connection Then remove brass end nut Install the quartz sleeve through the stainless steel threaded nipple until it is centered in the quartz spring Use a small amount of plumber s grease and install the O ring around the quartz sleeve Avoid riding the O Ring on any threaded part of the nipple Hand tighten the brass end nut to form a compression seal around the quartz sleeve Avoid over tigh...

Page 13: ...LACE DECIMAL 010 THREE PLACE DECIMAL 002 UNLESS OTHERWISE SPECIFIED 3 29 2017 ATS GDS CUSTOMER 3 5 2 6 7 ITEM NO PART NUMBER DESCRIPTION QTY 1 ATS GDSF GDS Control Box Front Cover 1 2 ATS 281P ATS 281P Circuit Board 1 3 ATS PBBP Plastic Control Box Back Plate 1 4 ATS 4003 Power Cord 1 5 03 SA 015 Molded Lamp Cord 1 6 07 00017 Fuse 1 7 ATS1 421P GDS Ballast 1 DO NOT SCALE DRAWING SHEET 1 OF 1 SCALE...

Page 14: ...H CHECKED ENG APPR MFG APPR DATE NAME TITLE SIZE DWG NO REV WEIGHT SCALE SHEET 1 OF 1 DO NOT SCALE DRAWING 12 6 3 5 2 1 10 7 4 8 11 13 9 ITEM NO PART NUMBER DESCRIPTION QTY 1 ATS 476D Domed Quartz 1 2 ATS4 450 UV Lamp 1 3 ATS 5172 Sightport Lens 1 4 ATS 5173 Orange 7 OD Viewport O Ring 1 5 ATS 5171 Sightport Nut 1 6 ATS5 410 Lock Nut 1 7 ATS GDS GDS Control Box 1 8 STS 8GPM 8 Gallon Per Minute Bot...

Page 15: ... 25 TWO PLACE DECIMAL 010 THREE PLACE DECIMAL 002 UNLESS OTHERWISE SPECIFIED 3 27 17 B GDS 12 CUSTOMER BOM 10 11 6 4 5 2 1 3 8 9 12 13 7 ITEM NO PART NUMBER DESCRIPTION QTY 1 ATS1 759D Domed Quartz 1 2 ATS4 739 UV Lamp 1 3 ATS 5173 Orange 7 OD Viewport O Ring 1 4 ATS 5172 Sightport Lens 1 5 ATS 5171 Sightport Nut 1 6 ATS5 410 Lock Nut 1 7 ATS 12GPM 12 GPM Flow Control 1 8 STS 12GPM 12 Gallon Per M...

Page 16: ...EE PLACE DECIMAL 002 UNLESS OTHERWISE SPECIFIED 3 29 2017 GDS 20 CUSTOME 8 6 5 1 12 13 2 7 3 4 10 11 9 ITEM NO PART NUMBER DESCRIPTION QTY 1 ATS 832D Domed Quartz 1 2 ATS4 810 UV Lamp 1 3 ATS 5173 Orange 7 OD Viewport O Ring 1 4 ATS 5172 Sightport Lens 1 5 ATS 5171 Sightport Nut 1 6 ATS5 410 Lock Nut 1 7 ATS8 544 Quartz Sleeve Black 1 2 OD ORing 1 8 ATS5 414 End Nut 1 9 STS 20GPM 20 Gallon Per Min...

Page 17: ...GDS 2016 17 Circuit Board Layout GDS 2019 www aquat com ...

Page 18: ... ATS 281P Circuit Bo B DRAWN TDB MATERIAL FINISH CHECKED ENG APPR MFG APPR DATE NAME TITLE SIZE DWG NO WEIGHT SCALE SH DO NOT SCALE DRAWING 4 21 16 THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF AQUA TREATMENT SERVICES ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF AQUA TREATMENT SERVICES IS PROHIBITED PROPRIETARY AND CONFIDENTIAL GDS 2019 www aquat com...

Page 19: ...s Electrical cord disconnected Check replace or outlet defective Defective U V lamp Replace lamp Defective lamp ballast Check output voltage Replace ballast Loose open circuit wire Trace out and repair Leak at quartz nipple Defective or cracked O Ring Replace O Ring O Ring not seated properly Replace O Ring Cracked quartz sleeve Replace quartz sleeve GDS 2019 www aquat com ...

Page 20: ...inutes 3 Open the sterile bottle or sterile container being used Holding the cap in a down position the operator should then hold his breath while taking the sample so as to avoid oral contamination of the sample The operator must not allow his finger to touch the inside of the cap or the neck of the bottle 4 After the sample has been taken the cap should immediately be tightly placed on the sampl...

Page 21: ...GDS 2016 21 Specifications GDS 2019 www aquat com ...

Page 22: ...GDS 2016 22 Notes GDS 2019 www aquat com ...

Page 23: ...GDS 2016 23 Notes GDS 2019 www aquat com ...

Page 24: ...GDS 2016 24 Warranty GDS 2019 www aquat com ...

Reviews: