
7.3 Floor space
7-3
8. Precision alignment
8-1
9. Trouble shooting
9-1
9.1 Dismantling of motor
9-1
9.2 Replacement of speed change belt
9-2
9.3 Replacement of brake block
9-3
9.4 Replacement of timing belt
9-4
10. Adjustment
10-1
10.1 Adjustment of backlash of leadscrew
10-1
10.1.1 Adjustment of cross leadscrew
10-1
10.1.2 Adjustment of backlash of longitudinal leadscrew
10-2
10.2 Adjustment of play between gibs
10-2
10.2.1 Adjustment of work table gibs
10-2
10.2.2 Adjustment of saddle gib
10-3
10.2.3 Adjustment of knee gib
10-4
10.2.4 Adjustment of ram gib
10-5
10.2.5 Adjustment of collect aligning screw
10-5
11. Maintenance
11-1
11.1 Daily maintenance
11-1
11.2 Monthly maintenance
11-1
11.3 Quarterly maintenance
11-1
12.Parts list
12-1
12.1 Head stock upside (1)
12-1
12.2 Head stock upside (2)
12-3
12.3 Head stock upside (3)
12-5
12.4 Head stock infrastructure (1)
12-7
12.5 Head stock infrastructure (2)
12-9
12.6 Head stock infrastructure (3)
12-11
12.7 Head stock infrastructure (4)
12-13
12.8 Column assembly
12-15
12.9 Knee assembly
12-17
12.10 Table, saddle assembly
12-19
12.11 Spindle guard (ce option)
12-21
Summary of Contents for K5S
Page 1: ...OPERATING MANUAL HEALTH AND SAFETY GUIDANCE NOTES MODEL K5V DATE 2002 10 01 VERSION 6 ...
Page 6: ...1 2 ...
Page 7: ...FIG1 2 1 3 1 4 SAFETY DEVICES AND INSPECTION ...
Page 8: ...1 4 2 MACHINE SPECIFICATIONS SPINDLE GUARD CE OPTION CHIP TRAY FIG1 3 ...
Page 14: ...FIG4 2 4 2 5 LUBRICATION 5 1 HEADSTOCK LUBRICATION ...
Page 26: ...7 3 8 PRECISION ALIGNMENT FIG7 3 ...
Page 37: ...FIG10 7 10 6 ...
Page 39: ...12 PARTS LSIT 12 1 12 1 HEAD STOCK UPSIDE 1 ...
Page 41: ...12 3 12 2 HEAD STOCK UPSIDE 2 ...
Page 43: ...12 5 12 3 HEAD STOCK UPSIDE 3 ...
Page 45: ...12 7 12 4 HEAD STOCK INFRASTRUCTURE 1 ...
Page 47: ...12 9 12 5 HEAD STOCK INFRASTRUCTURE 2 ...
Page 49: ...12 11 12 6 HEAD STOCK INFRASTRUCTURE 3 ...
Page 51: ...12 13 12 7 HEAD STOCK INFRASTRUCTURE 4 ...
Page 53: ...12 15 12 8 COLUMN ASSEMBLY ...
Page 55: ...12 17 12 9 KNEE ASSEMBLY ...
Page 57: ...12 19 12 10 TABLE SADDLE ASSEMBLY ...
Page 59: ...12 11 SPINDLE GUARD CE OPTION 12 21 ...
Page 60: ...13 SUMMART OF THE ELECTRICAL 13 1 ELECTRICAL COMPONENTS AND LAYOUT 13 1 ...
Page 62: ...13 3 POWER CIRCUIT 13 3 1 WIRING DIAGRAM FOR STAND ARD ELECTRIC BOX THREE PHASE 13 3 ...
Page 63: ...13 3 2 WIRING DIAGRAM FOR SIMPLE ELECTRIC BOX THREE PHASE 13 4 ...
Page 64: ...13 3 3 POWER CIRCUIT CE OPTION 13 5 ...
Page 65: ...13 6 ...