
Precision of a machine dominates the processing quality. To produce the quality work piece,
precession of each and every components is a top priority.
In order to maintain the primary machine precision following a long-term operation, regular
precision alignment is indispensable to the upgrading of work quality. Beside, it may extend
the
machine service life. For details of components to be aligned and precision requirements,
please
vide the table of precision inspection.
NOTE:
To align the vertically of spindle to the table surface, is necessary to loosen the three
machine head bolts (vide FIG6-6(p) ) and the four machine head nuts.
However, the bolts and nuts can not be loosened totally to prevent the components
from a sudden tilting. lock up (p) and (r) as soon as the alignment is performed.
8-1
9. TROUBLE SHOOTING:
Summary of Contents for K5S
Page 1: ...OPERATING MANUAL HEALTH AND SAFETY GUIDANCE NOTES MODEL K5V DATE 2002 10 01 VERSION 6 ...
Page 6: ...1 2 ...
Page 7: ...FIG1 2 1 3 1 4 SAFETY DEVICES AND INSPECTION ...
Page 8: ...1 4 2 MACHINE SPECIFICATIONS SPINDLE GUARD CE OPTION CHIP TRAY FIG1 3 ...
Page 14: ...FIG4 2 4 2 5 LUBRICATION 5 1 HEADSTOCK LUBRICATION ...
Page 26: ...7 3 8 PRECISION ALIGNMENT FIG7 3 ...
Page 37: ...FIG10 7 10 6 ...
Page 39: ...12 PARTS LSIT 12 1 12 1 HEAD STOCK UPSIDE 1 ...
Page 41: ...12 3 12 2 HEAD STOCK UPSIDE 2 ...
Page 43: ...12 5 12 3 HEAD STOCK UPSIDE 3 ...
Page 45: ...12 7 12 4 HEAD STOCK INFRASTRUCTURE 1 ...
Page 47: ...12 9 12 5 HEAD STOCK INFRASTRUCTURE 2 ...
Page 49: ...12 11 12 6 HEAD STOCK INFRASTRUCTURE 3 ...
Page 51: ...12 13 12 7 HEAD STOCK INFRASTRUCTURE 4 ...
Page 53: ...12 15 12 8 COLUMN ASSEMBLY ...
Page 55: ...12 17 12 9 KNEE ASSEMBLY ...
Page 57: ...12 19 12 10 TABLE SADDLE ASSEMBLY ...
Page 59: ...12 11 SPINDLE GUARD CE OPTION 12 21 ...
Page 60: ...13 SUMMART OF THE ELECTRICAL 13 1 ELECTRICAL COMPONENTS AND LAYOUT 13 1 ...
Page 62: ...13 3 POWER CIRCUIT 13 3 1 WIRING DIAGRAM FOR STAND ARD ELECTRIC BOX THREE PHASE 13 3 ...
Page 63: ...13 3 2 WIRING DIAGRAM FOR SIMPLE ELECTRIC BOX THREE PHASE 13 4 ...
Page 64: ...13 3 3 POWER CIRCUIT CE OPTION 13 5 ...
Page 65: ...13 6 ...