
SDK Programming Guide Version 1.511
ABLELink
R
Ethernet-Serial Server MAXI Series
Step 7:
Restart the GW21x-MAXI. The GW21x-MAXI will restart automatically each time the
program is successfully downloaded.
B.2 Critical Issues of Upgrading
1.
You can always abort the upgrading process by pressing the
<Esc>
key from host PC during the
upgrading process. The GW21x-MAXI will restart itself automatically and the system remains
intact.
2.
If the GW21x-MAXI does not receive any upgrade data within
30 seconds
during process, the
GW21x-MAXI will restart itself automatically and the system remains intact.
3.
After the upgrading process is finished, the GW21x-MAXI will program the flash memory. During
programming the flash memory, the GW21x-MAXI will clear the corresponding memory and reset
itself once an error occurs.
If everything is OK, the GW21x-MAXI's RUN LED blinks 3 times. It will then restart. Normally, it will
take around 10 seconds to complete programming the flash memory.
B.3 Error Messages
Copyright © 2004 Atop Technologies, Inc.
All rights reserved. Designed in Taiwan.