![Atom InfaLite Operation Manual Download Page 23](http://html1.mh-extra.com/html/atom/infalite/infalite_operation-manual_3004422023.webp)
21
MAINTENANCE
Maintenance Inspection
Monthly Inspection
6-3.
Check the following points every month.
Item to check
Procedure
Description
F-Rail Attachment/
Pole Mounting Attachment
(Sold separately)
Shake the main unit.
Shake the unit to check that the F-Rail At-
tachment/Pole Mounting Attachment is
not loose.
Loosen the fixing knob.
Remove the main unit from the peripheral
devices.
All parts
Visually check each part.
They should not be deteriorated (cracked,
bent, damaged, etc.)
White LED (with lens)
Visually check the LED.
The white LED should emit light.
Flexing arm
Move the main unit.
The irradiation head should hold in place.
✽
It may not be secure while in a horizontal
position and may drop downward, but this
is not a defect.
Linking arm
Move the main unit.
Each movable part should rotate without
becoming loose.
AC adapter
Insert the AC adapter plug into
the power outlet.
The stand-by indicator on the irradiation
head should turn “green”.
Semiannually Inspection
6-4.
Check the following points every six months.
Item to check
Procedure
Description
White LED (with lens)
Measure the light intensity with
a light intensity measurement
device.
The light intensity of the white LED should
reach the specified value (see “6-1. Measur-
ing the Light Intensity”).