www.atmos.cz
24-GB
GB
Instruction manual - GB
Basic setting of secondary air
Setting of the
rear
secondary air: DC105S
fully closed (0 mm) + 8 mm
Setting of the
rear
secondary air: DC150S
fully closed (0 mm) + 15 mm
Setting of the
front
additional
secondary air:
(DC105S and DC150S)
We regulate by turning the regulating (adjusting) screw. By
turning the screw by 1 revolution anticlockwise we open the
secondary air by 1,75 mm (1 revolution = 1,75 mm).
The manufacturer set the regulation to approx. 2 mm open-
ing (up to the stop + 1 turn anticlockwise).
INFO -
Adjustments to settings should be done on the basis of the waste gas analyzer and
maximum temperature; which must not exceed 320 °C at the outlet to chimney, at stabilised
nominal output /with closed ignition valve/. The boiler is set to optimal operating parame-
ters by the manufacturer.
25. Fuel Refill
Before fuelling, open the ignition valve /13/ with the pulling rod /17/. Wait for approximately
10 seconds and slowly open the loading door /2/ so that any accumulated gases are first draw off the
loading (upper) chamber into the flue-gas duct by exhaust fans instead of escaping into the boiler
room. Place a broad log over glowing charcoals. Be careful not to pack the fuel down too much above
the gasification nozzle. This may extinguish the flame. When loading fuel fill the hopper up com-
pletely. In order to prevent excessive smoke formation, load new batch of fuel only after the previous
fuel has combusted to at least one third of the loading volume.
ATTENTION - during operation the ignition valve pulling rod /17/ must be inserted.
INFO - In case of loading fuel and not running exhaust fans the fans automatically
starts by opening the door.
Regulating
screw
Rear
secondary air
regulation
Rear
secondary air
inlet
Exhaust
fan