37
-
Position
the
brackets,
passing the heads of the
screws through the oblong
holes.
-
Before screwing, align the hanging
bracket marks with the 2 screws.
-
Ensure that the hanging brackets
are level.
-
Screw down the brackets.
If the electrical junction box is
located above the lower hanging
bracket, pass the power cable
through the bracket to connect
the appliance. You will then avoid
pinching the cable.
1.3.2 - Connecting the appliance
For connection guidelines, refer to page 6, chapter "1.2.2 -
Connecting the radiator" for the Horizontal model.
1.3.3 - Mounting the appliance
Two people are required when handling radiators weighing more
than 20kg.
Once the connection to thepower supply is complete, turn the
power off at the mains supply board.
1. - Place the radiator on the floor in front of the hanging brackets.
2. - Lift the radiator to position the radiator"s lower hooks on the
lower hanging bracket.
3. - Bring the top of the radiator into contact with the upper hanging
bracket.
4. - Lift the radiator slightly.
Move the top of the radiator towards the wall.
Lower the radiator slightly.