Manual, Compliant Deburring Blade
Document #9610-50-1030-04
Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: +1.919.772.0115 • Fax: +1.919.772.8259 •
20
5. Preventive Maintenance
The CDB tool is designed to provide reliable service for long periods of operation. While simple in design,
there are few user serviceable parts in the assembly. The user is encouraged to return the unit to ATI for service.
Section 6—Troubleshooting and Service Procedures
is provided to assist the user when they chose to service the
unit in the field.
5.1 Pneumatics
The air lines to the CDB tool should routinely be checked for their general condition and replaced as
required. The air must be filtered, dry, and non‑lubricated. The air filters should be checked and replaced
as required to maintain optimum performance. The life of the filter elements is dependent on the quality of
compressed air at the customer’s facility and therefore cannot be estimated.
5.2 Lubrication
Lubrication systems are not to be used
. The CDB tool must be supplied with clean, dry, filtered air. See
for details on air supply and quality.
5.3 Blade Inspection
Blade wear depends on cut depth, feed rate, and material being deburred. Inspect the blade regularly for
wear and refer to
Section 6—Troubleshooting and Service Procedures
for
symptoms of a worn bur.