
Manual, Compliant Deburring Blade
Document #9610-50-1030-04
Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: +1.919.772.0115 • Fax: +1.919.772.8259 •
11
3. Installation of the Compliance Device
The CDB tool is delivered fully assembled. Optional equipment such as mounting plates and additional customer
supplied tool holders are separate.
3.1 Transportation and Protection during Transportation
The CDB tool is packaged in a case designed to secure and protect it during transportation. Always use the
case when transporting the CDB tool in order to minimize the risk of damage.
3.2 Inspection of Condition When Delivered
Upon receipt, the following should be checked:
•
Delivery is in accordance with freight documents.
•
Packaging is in good condition.
If there is damage to any of the packaging, or if any of the goods have been exposed to abnormal handling,
unpack those parts that may have been damaged for a closer inspection. If necessary, notify ATI for
assistance in evaluation of the product condition.
3.3 Unpacking and Handling
The CDB tool should always be placed inside the accompanying case during transportation, storing and
handling.
Pneumatic lines are attached, bundled, and must be strain‑relieved in a manner that allows for freedom of
movement during operation.
3.4 Storage and Preventive Maintenance during Storage
Store the CDB tool in its case when it is not in use. The CDB tool should also be stored in a dry place.
For long‑term storage, the CDB tool should be thoroughly cleaned of any burrs or debris. It should not be
disassembled. Place the CDB tool inside a sealed, plastic bag inside the case.