6.
Checks before commissioning
a.
All screws, nuts, electrical and hydraulic connections etc. are tightened.
b.
Check all hydraulic connections and cylinders for leaks and tighten if necessary.
c.
Functional test of all electr. and mechanical components. Make sure that when you press the
pushbutton or mech. Release lever release all safety catches.
d.
Check the support arm lock for proper function.
e.
Check the correct direction of rotation of the motor.
Raise and lower the lift 2 to 3 times and check the synchronization of the two pallet trucks.
f.
Lower the lift completely and hold the "LOWER" button pressed for approx. 15 seconds so
that the hydraulic system is completely vented.
Important, check that the notches snap into place at the same height when starting up.
7.
First lifting with a load
a.
Raise to approx. 1000 mm with a load (approx. 1500 kg).
b.
Check all parts and dowels.
c.
If the arms are not at the same height, readjust if necessary.
d.
When everything has been checked and is in order, move up and down at least 3 times.
Carefully approach the upper limit switch the first time and check that it is working.
e.
Check the support arm lock.
f.
Lower the lift and completely assemble all parts and covers.
g.
Finally fill the test book.
Only a careful and professional installation of the lift by a trained specialist ensures safe
function and maintains the guarantee claims.
2.10 Theses
Before commissioning, check all fastening screws, electrical, pneumatic and hydraulic
lines and, if necessary, tighten these. Warning: in some cases, this must be checked at
regular intervals and tightened if necessary (note in the instructions).