For the following points, all columns must be closely observed throughout the process.
•
Set the selector switch to "main lift" and press the LIFT button, after a short time the cylinder fills
with oil and tensions the lifting ropes.
•
Raise the platform until the crossbars are approx. 50 mm above the trestles or the squared timbers.
•
Then align the columns to the crossbar using a spirit level.
•
A safety anchor is attached to each column to secure it.
•
Now the trestles or squared timbers can be removed.
•
Move the lifting platform to the lowest position using the LOWER button.
•
Now check the position of the columns again and attach the remaining safety anchors as described
in the next step.
•
Before proceeding, check the dimensions against the floor plan and make sure that the base plate
of each column lies flat on the ground and that the column is aligned at right angles.
•
Use the base plate as a guide and drill each hole with a hammer drill.