® Copyright ATH-Heinl GmbH & Co. KG, All rights reserved / Misprints and technical changes reserved / As of: 2020-10
Manufacturer ATH-Heinl GmbH & CO.KG
- 34 -
6.
Installing of the synchronization ropes
a.
Bring the synchronization ropes over the pulleys
b.
Lubricate the bolts of the pulleys, as is specified in the lubrication schedule.
c.
Fit the pulleys and fix and SECURE THEM WITH THE DELIVERED SEEGER RINGS
d.
Install the synchronization ropes as shown in the next drawings.
An adjustment of the synchronization ropes after a short operation time is eventually
needed due to the material and does not mean that it is a warranty work but a
maintenance work for which is the user responsible.
By H-Version
By L / X -Version