® Copyright ATH-Heinl GmbH & Co. KG, All rights reserved / Misprints and technical changes reserved / As of: 2020-10
Manufacturer ATH-Heinl GmbH & CO.KG
- 39 -
4.0
MAINTENANCE
The user must maintain the machine regularly to ensure safe operation.
Repair work may only be carried out by authorised service partners or after customer consultation with the
manufacturer.
Before maintenance and repair work:
-
The machine must be disconnected from ALL supply networks
-
Pull main switch out of mains plug, if necessary, discharge compressed air from system
-
Appropriate measures must be taken against a restart
Work on electrical elements or on the supply line may only be carried out by experts or
electricians.
4.1
Consumables for installation, maintenance and servicing
Hydraulic Oil
General
minimum requirement:
Eni PRECIS HVLP-D Item No. 00066018
Summer
(15° to 45°):
HVLP-D 46 (e.g.: Eni PRECIS HVLP-D)
Winter
(under 10°):
HVLP-D 32 (e.g.: Eni PRECIS HVLP-D)
Minimum requirement
especially for 2-post lifts:
Eni PRECIS HVLP-D Item No. 00067218
Summer
(15° to 45°):
HVLP-D 32 (e.g.: Eni PRECIS HVLP-D)
Winter
(under 10°):
HVLP-D 22 (e.g.: Eni PRECIS HVLP-D)
Preservative for ropes, welds, screws, corners, edges and cavities.
Minimum requirement:
Petec spray translucent - 500 ml Item No. 73550 / Petec wall inlet translucent - 1000 ml
Item No.
73510
Petec UBS pistol
Item No. 98507
Slideway lubricant
Minimum requirement:
STORER WHS 2002 White EP high performance grease. Item No. KPF1-2K-20
Lubricant for bushes, chains, rollers & moving parts
Minimum requirement:
White ultra lube, 500 ml aerosol. Item No. 34403 – WUL – White Ultra Lube
Floor anchor
Minimum requirement
for lifting platforms:
Fischer FIS A M 16 x 200 galvanised in combination with Fischer Superbond reaction cartridge
Minimum requirement for
passenger car and passenger car/truck balancing machine:
Impact anchor M8 x 100