3)  Only original spare parts from the manufacturer should be used. Please note that there are no 

components in this unit which can be repaired by using glue, silicone or any other similar method. 

 

4)  The green colour on transparent parts of Slam® Hornet Emergency may be damaged because of 

external affects like solvents or chemicals or mechanical stress. In case the green colour has 

disappeared in one area greater than 100 cm

2

 the part has to be changed. The surface resistance of the 

transparent parts has to be between 1 MΩ - 1 GΩ.  

 

5)  Maintenance instructions with exploded-view diagram and spare parts list are available at your local 

distributor and the manufacturer. Please, when requesting maintenance instructions with exploded-view 

diagrams, include the model and serial number of the product. 

4.3 Testing 

Tests are to be done according to EN 60079-19 until returning the repaired unit back to operation. Below 

mentioned  tests shall be done in addition to the tests specified in EN 60079-19 

 

 

PE 

–resistance test 

 

High-voltage test (500 VDC between Phase& Neutral against P/E conductor) 

 

Operational test 

 

Test of expected use (vibrations, shaking) 

 

Proper testing ensure safe operation of repaired equipment. 

4.4 Repair report 

The operator is responsible for keeping up to date record of the condition of his equipment (EN 60079-14). 

Ensuring the availability of this important information each repair procedure should be written down in repair 

report according to EN 60079-19. 

 

This report should reveal at least: 

 

Person who conducted the maintenance 

 

Date of maintenance 

 

Procedure of maintenance 

 

Signature of person responsible accepting the maintenance 

4.5 Periodical testing of CentaurSlam Hornet Emergency 

Before test, allow battery to be fully charged. Operation of the battery must be checked 4 times a year by cutting 

off the input voltage. Operation time in battery mode should be over 45 minutes. If not, luminary is to be serviced. 

 

 

 

 

Summary of Contents for Slam Hornet Emergency 18+40W

Page 1: ...ication N o VTT 08 ATEX 030X Thank you for choosing Slam Hornet Emergency portable work light for your job site Purpose of this manual is to provide you all the necessary safety and product informatio...

Page 2: ...2 16...

Page 3: ...p IIA IIB or IIC in accordance with Equipment group IIA IIB or IIC 9 2 1 4 Temperature class of the equipment 9 2 1 5 Environmental criteria 9 3 Operating instructions 10 3 1 Personnel 10 3 2 Before f...

Page 4: ...16 4 3 Testing 14 4 4 Repair report 14 4 5 Periodical testing of CentaurSlam Hornet Emergency 14 4 6 More information about the use of Electrical Apparatus for Explosive Gas Atmospheres 15 Helpdesk 1...

Page 5: ...tificate for special conditions of safe use of the equipment Special conditions of safe use specifies Ambient temperature can be 20 C 40 C without Ex socket With Ex socket as specified for the used so...

Page 6: ...of 20 C 40 C Gb Explosion Protection Level EPL marking for HIGH level of protection Equipment for explosive GAS atmospheres which is not a source of ignition in normal operation or during expected mal...

Page 7: ...g appropriate help for the user to complete his job Cable Standard cable of the Slam Hornet series is H07BQ F This cable has polyurethane PUR outer sleeve PUR withstands well chemicals as well mechani...

Page 8: ...can not be identified visually Testing voltage applied is 2130VDC Maximum leakage current is 5mA Test of expected use of equipment The luminary is subjected to shaking and vibration to see that all th...

Page 9: ...o three different groups IIA IIB and IIC Further information about the substances can be found from EN 60079 10 Slam units mentioned in this instruction are Equipment group IIC 2 1 4 Temperature class...

Page 10: ...ts or defects on the unit are noticed it is prohibited to take such a unit into Ex area until the corrective actions have been made 3 4 Special attention on 2 pole use 24 V or 42 V Certain Slam Hornet...

Page 11: ...ts 1 The user is fully responsible for the use of the equipment including service and maintenance 2 In case of adding accessories the following is mandatory a The construction of the certified unit sh...

Page 12: ...rmful and may damage the ballast permanently when subjected to excessive peaks continuously If fluorescent tubes are flickering when the units are chained up it may be due to excessive linking This ma...

Page 13: ...Inspection Maintenance 4 1 After Use Take the following steps after the Slam Hornet Emergency unit has been taken out from Ex area 1 Clean the unit with a damp cloth do not use detergents or solvents...

Page 14: ...returning the repaired unit back to operation Below mentioned tests shall be done in addition to the tests specified in EN 60079 19 PE resistance test High voltage test 500 VDC between Phase Neutral a...

Page 15: ...tandards of the day Please study at least the following standards EN 60079 14 Electrical installations in hazardous areas EN 60079 10 Classification of hazardous areas EN 60079 17 Inspection and maint...

Page 16: ...16 Helpdesk Under any doubt or question please contact your local distributor or the manufacturer Contact details Phone 358 20 734 3250 Fax 358 20 734 3299 Email info atexor com Web http www atexor c...