AWM-2-LTH75-H Page 3 of 6
AWM-P
Post
COMPONENT CHECKLIST
A
Post
(x1)
C
Screw
M8
(x2)
B
Post Cap
(x1)
E
Cable Cover
(x2)
D
Cable Cover Cap
(x4)
3.
Position Cable Cover and fit Post Cap
3.1
To reposition the cable cover, pull it straight up and out
of the post and insert it into any of the available channels
3.2
Fit post cap onto the top of the post
SQUEEZE
SQUEEZE
SQUEEZE
SQUEEZE
Optional cable
cover positions
Allen Key
(Supplied w/fixing)
Post
Post Cap
NOTE:
An allen key
may be stored in
the Post Cap.
1.
Attach Post to Fixing
FC
C Clamp
FB
Bolt
Through
Kit
AC-GC
Grommet
Clamp
FH
HD F Clamp
FF
F Clamp
FC
C Clamp
FB
Bolt
Through
Kit
AC-GC
Grommet
Clamp
FH
HD F Clamp
FF
F Clamp
FC
C Clamp
FB
Bolt
Through
Kit
AC-GC
Grommet
Clamp
FH
HD F Clamp
FF
F Clamp
Supplied
Heavy Duty
F Clamp
AWM-FH
Also Compatible
Grommet
Clamp
AC-GC
1.1
Follow the Heavy Duty F Clamp installation
guide on pages 2 of this booklet or provided
with your alternate fixing option.
2.
Mount Clamp to Post
2.2
Do not mount monitor
arm on rear channel post
when using the supplied
Heavy Duty F Clamp
2.1
Slide clamp into post and
position to desired height. Turn
knob to lock in place.
If you are installing multiple mounts,
use the guide marks on post as
reference for setting the height of
each arm. Final fine-tuning may be
required once monitor is installed.
NOTE:
Guide marks only available on
400 post, 510 post and 750 post.
4.
Cable clips and cover
PUSH
4.1
Push the cable down
into the cable clip.
4.2
Insert one
side of the cable
clip into the
channel on the
post assembly,
then push
in the other side.
4.4
Feed
remaining
cable into
the cover.
Load cables
into cable
cover
4.3
Loop cable
and insert into
cable cover.
Cables can
exit from the
side of the
cable cover
PUSH
PUSH