GTDHR FIRST / PREMIUM / INFINITE
ENERGY RECOVERY UNIT
MS-CDF-001 A
Ind A
update 01/07/2011
Created by JC
Validated by AR
21 / 36
Normal speed schedule
Normal speed
Monday
(2)
Per 1 :
07:00 - 12:00
Per 2 :
14:00 - 18:00
Normal speed
Monday Friday
(2)
Per 1:
07:00 - 12:00
Per 2:
14:00 - 18:00
Normal speed
Tuesday
(2)
Per 1 :
07:00 - 12:00
Per 2 :
14:00 - 18:00
Etc… up to vacations
Time setting
Time/Date
Time:
15:54 (1)
Date :
2011-01-25 (1)
Day:
Tuesday (1)
Reduced speed schedule
Reduced speed
Monday
(3)
Per 1 :
12:00 - 14:00
Per 2 :
18:00 - 00:00
Reduced speed
Monday Friday
(3)
Per 1 :
12:00 - 14:00
Per 2 :
18:00 - 00:00
Reduced speed
Tuesday
(3)
Per 1 :
12:00 - 14:00
Per 2 :
18:00 - 00:00
Etc… up to Sunday and vacations
Vacations (mm:dd) up to 24 periods
(4)
1:
01-01 - 01:01
(example 1 January)
2:
12-25 - 12:25
(example 25 December)
(1)
Time/Date/Day Setting (see chapter VII.3.2.a)
(2)
High Speed periods setting (see chapter VII.3.2.b)
(3)
Low Speed periods setting (see chapter VII.3.2.b)
(4)
Vacation dates setting (see chapter VII.3.2.c)
(5)
Setting of speeds, pressures, flow-rates (see chapter VII.3.3)
(6)
CO2 level setting (see chapter VII.3.5)
(7)
The unit's On/Off operation setting (see chapter VII.3.6)
(8)
Temperature set-point setting (see chapter VII.3.4)
Vacations
The forced start menu
should not be used. All the
values should be at 0.
Access right
Enter
Exit
…
Enter password
Of the author. level
Desired:
****
Actual lev.:
Exit this level
of authorisation?
NO or YES
Actual lev.: