
IN-2
Index
________________________________________________________________________________________________
________________________________________________________________________________________________
________________________________________________________________________________________________
J
jumpers
location of on the mother board 2-5
location of on the VDC600 board 3-1
K
keyboard
connecting the 5-3
M
memory
adding 2-1
modem
connecting the 5-4
remote maintenance,the 5-4
monitor
connecting the 5-3
mother board
jumper location on the 2-5
jumper settings on the 2-5
on the 6386/25 Version 1 2-3
on the 6386/25 Version 2 2-3
on the 6386/33 2-2
P
partitioning the disk 6-3
peripherals
connecting the 5-1
connector locations for the 5-1
POST (power-on self test) 6-1
power requirements 1-1
preassembled (ALT) systems 1-3
printer
connecting a 5-5
R
RAM
remote maintenance modem
connecting the 5-4
removing the cover
from a 6386/25 WGS A-1
replacing the cover
on a 6386/25 WGS A-4
on a 6386/33 WGS A-3
S
safety considerations 1-2
serial port
disabling the second 2-9
set-up utility 6-3
SIMM locations
on the 6386/25 Version 1 2-3
on the 6386/25 Version 2 2-3
on the 6386/33 2-2
SIMM strips
installation of 2-1
site selection and verification 1-1
SW1.1 3-4
SW12.1 3-4
switches
setting on the IVP4 board 3-4
setting on the VDC600 board 3-1
SW1.1 3-4
SW12.1 3-4
T
temperature requirements 1-1
tools required 1-2
V
VDC600 board 3-1